Council archive · source document
Request to Change Current Application · OPW11/0023
Very large file (10.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.
BUNNINGS WAREHOUSE, NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN
Cardna
4. STORM WATER QUALITY
4.1 Stormwater Management Practices
The formulation and implementation of the stormwater management plan for the
development is based on the following key principles.
J
• Adoption of Water Sensitive Urban Design (WSUD) principles throughout the site.
This includes consideration of features such as preventing the concentration of flow
in downstream areas and the use of wetland systems to manage runoff water
quality.
• Management and control of water quality both during and after construction. A
detailed Erosion and Sedimentation Control Plan will need to be developed in
accordance with recognised standards during the detailed design phase and
implemented on site during the subdivision construction process.
A Stormwater Quality Management Plan (SQMP) has been prepared for the site that uses
these principles to describe how stormwater runoff from the site is to be treated to comply
with the water quality objectives specified for the receiving water bodies (refer Section 3.1).
This SQMP describes the stormwater management measures proposed for the site, and
includes the following broad steps:
U • Identify environmental values and water quality objectives for discharge from site
(refer Section 4.5);
• Consider types of stormwater management practices appropriate for use within
development (refer Section 4.2);
• Demonstrate that water quality objectives can be met with available stormwater
management practices (refer Section 4.8).
4.2 Available Management Practices and Suitability
A wide range of stormwater management practices are available to achieve the principles
of Water Sensitive Urban Design. All have been shown to be successful when correctly
designed, but selection of the most appropriate practices for a particular development is
highly dependent on site conditions.
The Table overleaf lists the most common stormwater management practices currently
used, along with opportunities and constraints for their use. This table forms the starting
point for stormwater management for the site. Considering the site's constraints, not all of
the measures outlined in the table are suitable. Each treatment option is therefore
discussed in more detail and comment made on the suitability of each in the context of the
development.
Bunnings Warehouse Version 1 15 December 2006
J'\3501-54\WP\SWMPdoc Commercial in Confidence Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request to Change Current ApplicationRelated documentApplication case desk ↗
About this file
- File size
- 10.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.