BUNNINGS WAREHOUSE. NOOSAVILLE
SURFACE WATER MANAGEMENT PLAN `,) Cardno
7. CONCLUSION
Bunnings Warehouse plan to develop a new retail outlet in Noosaville, on the corner of the
Noosa-Eumundi Road and Gateway Drive.
The development of the site for its commercial use will lead to an increase in impervious
area across the site (although it should be noted that there is a far greater landscaped area
across the site than is normally the case for such development types). An increased
amount of runoff will occur during a storm, which will flow at an increased rate. To alleviate
flooding problems on site or downstream of it, a detention basin has been provided which
will detain flows and release them in a controlled manner over time for all flows up to and
including the 100-year event.
The key data for the detention basin is summarised below:
Table 14 Detention Basin Parameters: Summary
Parameter Value
Volume 1500m
Depth 1200mm
Freeboard 300mm
Outlet diameter 525mm
Outlet invert +300mm
Overflow weir width 20m
Overflow weir invert +1150mm
In order to protect the environmental value of the receiving water body, appropriate
stormwater treatment measures have been adopted for the site. Modelling of the
performance of these measures has indicated that the water quality objectives applicable to
the site and its watercourse will be met. The proposed treatment measures will reduce the
total annual load of pollutants entering the creek to meet or exceed standard performance
targets.
Discharges from the site will eventually pass to the Noosa River, and so it is important that
runoff quality be maintained following development. As the human activity expected for the
site could lead to pollution (particularly from litter and vehicles), bio-retention devices will be
employed across the car-parking areas of the site to capture nutrients, hydrocarbons and
gross pollutants. All runoff originating from storms of up to the three month return period
will undergo treatment by passing through a sandy-loam filter before passing to the
detention basin.
This report sizes the detention basin for the site, and suggests water sensitive urban design
measures to ensure quality is maintained. Quantity modelling of the performance of the
detention basin indicates that the proposed runoff rate will match the existing in all events
of up to the 100-year return period. Quality modelling of the treatment train has indicated
that the water quality objectives applicable to the site will be met in all cases.
r
Bunnings Warehouse Version 1 15 December 2006
J \3501-54%WP,SWMP doc Commercial in Confidence Page 18
1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request to Change Current ApplicationRelated documentApplication case desk ↗
About this file
- File size
- 10.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.