Skip to the record
The gold standard in government transparency.

Council archive · source document

Request to Change Current Application · OPW11/0023

of 66

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.6 MB): the original may take a few minutes to open or download. The page text below is quick to read.

    BUNNINGS WAREHOUSE, NOOSAVILLE
    SURFACE WATER MANAGEMENT PLAN                                                  ll^a^ Cardno

                       Maintenance is primarily concerned with:

                           •       Maintenance of flow to and through the bio-retention basin
                           •       Maintaining vegetation
                           •       Preventing undesired overgrowth vegetation from taking over the bio-
                                   retention basin
                           •       Removal of accumulated sediments
                           •       Litter and debris removal

1                      Vegetation maintenance will include:

                            •      Fertilising plants
                               •   Removal of noxious plants or weeds
                               •   Re-establishment of plants that die.

                      Sediment accumulation at the inlets needs to be monitored. Depending on the
                      catchment activities (eg building phase) the deposition of sediment can tend to
                      smother plants and reduce the ponding volume available. Should excessive
                      sediment build up it will impact on plant health and require removal before it
                      reduces the infiltration rate of the filter media.

                      Similar to other types of practices, debris removal is an ongoing maintenance
                      function. Debris, if not remove, can block inlets or outlets, and can be unsightly
                      if located in a visible location. Inspection and removal of debris should be done
                      regularly, but debris should be removed whenever observed on the site. "

               Given the above, a three monthly inspection frequency is proposed until the catchment has
               become stabilised (i.e. until the development is largely complete). After this time, the
               frequency of inspections can be reduced to every six months or as determined by the
               operational performance of the devices.




C
    Bunnings Warehouse                                        Version 1                         15 December 2006
    J\3501-541WP'SWMPdoc                                Commercial in Confidence                        Page 17




1

Used in these records

About this file

File size
10.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Request to Change Current Application.pdf · 10.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.