Minor Change Existing Approval - RAL19 0018.01 (As Published)
native animal for breeding activities. This is regulated by Section 332 of the Nature
Conservation Wildlife Management Regulation 2006. Further information regarding this
matter can be obtained at this website https://www.ehp.qld.gov.au/licences-permits/plants-
animals/species-management-program/ or by calling the Department of Environment and
Heritage Protection on 1300 130 372.
Road Naming Procedure
4. Road names must be approved by Council before a subdivision plan is submitted for
compliance assessment and signing. A written request for proposed naming of roads must
be submitted to Council together with a plan of the proposed roads and a completed road
naming application form. Further details can be found on Council’s website.
Building and Construction Industry (Portable Long Service Leave) Levy
5. The QLeave levy must be paid prior to the issue of a development permit where it is required.
Council will not be able to issue a Decision Notice without receipt of details that the Levy has
been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855.
Co-ordination of Operational Works Assessment
6. Additional application fees apply to Operational Work applications where the different
aspects of the works are lodged separately. Significant savings in application fees will result
if all works are lodged in a single application.
Qualified Person
7. For the purpose of preparing a Geotechnical Report, and for certifying geotechnical stability
for the development, a qualified person is considered to be a person who:
a. is a Registered Professional Engineer of Queensland (RPEQ); and
b. has a degree in civil engineering or engineering geology; and
c. has a minimum of 5 years experience in the field of geotechnical engineering or
engineering geology.
Preparation of a Preliminary Construction Management Plan
8. A preliminary Construction Management Plan must be submitted with the Operational Works
application and must address the following:
a. traffic management during all aspects of the construction phase including:
a. a Traffic Management Control Plan in accordance with the Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
control measures prior to construction.
b. maintenance of safe pedestrian and vehicle access for the areas affected by
the works during and after daily construction has ceased.
c. proposed fencing to the site during the construction phase of the
development.
d. provision for worker car parking.
b. maintenance and protection of water quality and existing drainage lines through the
construction site, through the implementation of appropriate erosion and sediment
control measures
c. works programme identifying key components of the works and their respective
durations
d. establishment of a communication protocol with the general public, adjoining owners,
emergency services and local businesses to advise of agreed construction times,
impacts on traffic, services and other relevant issues
Page 12 of 15
Document Set ID: 24931816
Version: 3, Version Date: 13/07/2026