Minor Change Existing Approval - RAL19 0018.01 (As Published)
e. identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
f. details on the location of external fill sites/sources, the haulage route, type of vehicle
to be utilised during filling operations and frequency of usage. NB any damage to the
existing road system as a result of haulage operations shall be fully repaired at the
applicant’s expense
g. it is acknowledged that the preliminary Construction Management Plan will be a draft
document requiring finalisation upon appointment of the Principal Contractor employed
to construct the works and a final document will be required to be submitted at the Pre-
Start Meeting for the project.
Private Infrastructure
9. All private infrastructure for the development must be designed to meet the planning scheme
requirements unless otherwise agreed by the relevant authority.
Qualified Person
10. For the purpose of preparing a Landscape Plan, a qualified person is considered to be a
landscape architect, landscape designer and/or horticulturist with a minimum of 3 years
current experience in the field of landscape design.
11. For the purpose of preparing a Rehabilitation Plan, a qualified person is considered to be a
landscape architect or ecologist with a minimum of 3 years current experience in the field of
landscape design.
12. For the purpose of preparing a Fauna Management Plan, a qualified person is considered to
be an ecologist with a minimum of 3 years current experience in the field of fauna assessment
and management.
13. For the purpose of preparing a Bushfire Management Plan, and for certifying compliance
with the bushfire requirements of this Decision Notice, a qualified person is considered to be
an ecologist with a minimum of 3 years current experience in the field of bushfire assessment
and management.
7. PROPERTY NOTES
The following property notes will be placed against the subject property in Council’s property record
system:
RAL19/0018 - Geotechnical Stability
1. The following notation applies to all approved lots:
To ensure the geotechnical stability of this lot is maintained, all buildings and structures must
be sited and constructed in accordance with the geotechnical conditions of Council Approval
RAL19/0018 and the associated Operational Works approvals.
RAL19/0018 - Concrete Bin Pad
2. The following notation applies to approved lot 8:
A concrete bin pad for this lot has been constructed on the roadside in front of Lot 4. Bins
must be placed on the concrete bin pad on collection day.
RAL19/0018 - Concrete Bin Pad
3. The following notation applies to approved lot 4:
A concrete bin pad for Lot 8 has been constructed on the roadside in front OR near to this
lot. The property owner should be aware that bins associated with Lot 8 could be placed on
the concrete bin pad on collection day.
Page 13 of 15
Document Set ID: 24931816
Version: 3, Version Date: 13/07/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original