51. Pedestrian and bicycle facilities must be provided for the development. The works must
include in particular:
a. signage and lighting at strategic locations to direct people to building entries and public
toilet facilities;
b. a total of 30 bicycle parking spaces; and
c. end of trip facilities involving 27 lockers, 6 showers and change rooms within the
development.
Water quality and quantity
52. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works approval
and the Queensland Urban Drainage Manual.
53. A stormwater quality treatment system must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and the Bioretention
Technical Design Guidelines (Water by Design, 2012), and must include in particular:
a. stormwater quality treatment devices of a size and location generally in accordance
with those shown in Drawing No. C6070/20/P07 prepared by Walsh Consulting
Engineers dated 26/10/2021, with the exception of the following:
i. Bioretention filter area is to be increased in size to the area stated for bioretention
surface area on the above referenced plan
b. bioretention devices which:
i. are designed generally in accordance with IPWEQA Standard Drawing No.s DS-
073, DS-075 and DS-076
ii. are provided with a free-draining outlet from the sub-soil drainage system
54. Permanent educational signage* must be erected to educate the residents of / customers to
the development about the function of the bioretention device(s). The dimensions, standard,
presentation and location of the educational signage must be in accordance with an
Operational Works approval.
55. All stormwater quality treatment devices must be maintained in accordance with the Water
by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). The approved
Operational Works drawings for the stormwater quality treatment system and detailed life
cycle costing of the system must be attached as an addendum to this document. Records of
all maintenance activities undertaken must be kept and made available to Council upon
request.
56. Operating roof water harvesting tanks must be provided for the development. The tanks must
be provided in accordance with an Operational Works approval and must include in
particular:
a. a total tank capacity of 54,000 litres
b. a catchment of not less than 2,000m2 of the building roof area
c. re-use of harvested stormwater for non-potable outdoor uses including irrigation of
landscaped areas and swimming pool top-ip
57. Certification must be submitted to Council from a qualified person which certifies that the
stormwater harvesting tanks and associated reticulation has been installed in accordance
with the requirements of this Decision Notice.
Acid Sulfate Soils
58. An Acid Sulfate Soil Management Plan must be prepared and submitted with the Operational
Works application for the site. The acid sulfate management plan must include testing,
monitoring and treatment requirements for the works.
Page 8 of 53
Document Set ID: 23976352
Version: 3, Version Date: 30/07/2025
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Negotiated Decision Notice MCU21 0110.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.