Skip to the record
Search everything, all in one place.

Original source · versioned page text

Negotiated Decision Notice MCU21 0110.pdf

of 53

Page text read automatically using OCR, there may be inaccuracies

                      Pedestrian and Bicycle Facilities
               51.    Pedestrian and bicycle facilities must be provided for the development. The works must
                      include in particular:
                      a.      signage and lighting at strategic locations to direct people to building entries and public
                              toilet facilities;
                      b.      a total of 30 bicycle parking spaces; and
                      c.      end of trip facilities involving 27 lockers, 6 showers and change rooms within the
                              development.
               Water quality and quantity
               52.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken in accordance with an Operational Works approval
                      and the Queensland Urban Drainage Manual.
               53.    A stormwater quality treatment system must be provided for the development. The works
                      must be undertaken in accordance with an Operational Works approval and the Bioretention
                      Technical Design Guidelines (Water by Design, 2012), and must include in particular:
                      a.      stormwater quality treatment devices of a size and location generally in accordance
                              with those shown in Drawing No. C6070/20/P07 prepared by Walsh Consulting
                              Engineers dated 26/10/2021, with the exception of the following:
                                i.     Bioretention filter area is to be increased in size to the area stated for bioretention
                                       surface area on the above referenced plan
                      b.      bioretention devices which:
                                i.     are designed generally in accordance with IPWEQA Standard Drawing No.s DS-
                                       073, DS-075 and DS-076
                               ii.     are provided with a free-draining outlet from the sub-soil drainage system
               54.    Permanent educational signage* must be erected to educate the residents of / customers to
                      the development about the function of the bioretention device(s). The dimensions, standard,
                      presentation and location of the educational signage must be in accordance with an
                      Operational Works approval.
               55.    All stormwater quality treatment devices must be maintained in accordance with the Water
                      by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). The approved
                      Operational Works drawings for the stormwater quality treatment system and detailed life
                      cycle costing of the system must be attached as an addendum to this document. Records of
                      all maintenance activities undertaken must be kept and made available to Council upon
                      request.
               56.    Operating roof water harvesting tanks must be provided for the development. The tanks must
                      be provided in accordance with an Operational Works approval and must include in
                      particular:
                      a.      a total tank capacity of 54,000 litres
                      b.      a catchment of not less than 2,000m2 of the building roof area
                      c.      re-use of harvested stormwater for non-potable outdoor uses including irrigation of
                              landscaped areas and swimming pool top-ip
               57.    Certification must be submitted to Council from a qualified person which certifies that the
                      stormwater harvesting tanks and associated reticulation has been installed in accordance
                      with the requirements of this Decision Notice.
               Acid Sulfate Soils
               58.    An Acid Sulfate Soil Management Plan must be prepared and submitted with the Operational
                      Works application for the site. The acid sulfate management plan must include testing,
                      monitoring and treatment requirements for the works.


                                                                                                               Page 8 of 53
Document Set ID: 23976352
Version: 3, Version Date: 30/07/2025

Log in to download the original (Negotiated Decision Notice MCU21 0110.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.