14354_Council_Information response_090316
Attached to the e-mail MCU15/0108 & REC15/0028 - Information Response.
Response:
Refer attached updated proposal plans prepared by RC Studio together with vehicle turning path
diagrams prepared by SCG Consulting Engineers.
4. Provide a preliminary stormwater drainage plan for the proposed development. The plans must be
prepared by an RPEQ and include but not be limited to:
(a) The connection point to Council’s system
(b) Any necessary detention and/or proposed reuse
(c) Any necessary easements within the site.
Response:
Refer attached Stormwater Drainage plan prepared by SCG Consulting Engineers. This plan
demonstrates that the site can be connected to Councils stormwater system and provide an
appropriate stormwater outcome. A private drainage easement over part of the proposed drainage
system which provides for a shared connection point between the proposed drainage cells within each
lot to Councils existing stormwater pit will be required.
The Information and Referral Stage of IDAS has now concluded and the application is now in the
Decision Stage.
Should you have any questions with respect to the above, please do not hesitate to contact me direct.
Yours faithfully
PROJECT URBAN
Scott Sobey
DIRECTOR
Email: [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.