IDAS Form 27 - Cooroibah
Attached to the e-mail Development Permit – 23 Jirrima Crescent, Cooroibah MCU16/0099.
Attached to the e-mail Changed MCU application addition of OPW Application MCU16/0099 & OPW16/0218.
5. Constructing a new or modifying (including maintenance and replacement of) an existing culvert
What is the nature of the proposed work? Construction of a new culvert
Maintenance of an existing culvert
Replacement of an existing culvert
What is the purpose of the proposed culvert?
Heavy vehicle access to facilitate construction of nbn™ Telecommunications Facility.
For a temporary barrier (i.e. in place less than 12 months), how many days will the culvert be in days
place?
Will the culvert extend across the waterway from bank to bank?
Yes
No - how long is the proposed culvert (across the waterway)? metres
- how wide is the waterway (bank to bank)? metres
What type of culvert is proposed?
Box culvert Arch culvert Pipe culvert
Combination culvert Other—please specify:
In reference to the diagrams below, provide the following details of the proposed culvert.
How many culvert cells are there? 2
What is the upstream downstream culvert cell length? 4.8 metres
What is the inside cell width of each culvert (or diameter of pipe culvert)? 1.2 metres
What is the internal height within the culvert cell? 1.2 metres
IDAS form 27—Waterway barrier works
Version 3.2—3 August 2015
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.