Original source · versioned page text
IDAS Form 27 - Cooroibah
Attached to the e-mail Development Permit – 23 Jirrima Crescent, Cooroibah MCU16/0099.
Attached to the e-mail Changed MCU application addition of OPW Application MCU16/0099 & OPW16/0218.
For a temporary barrier (i.e. in place less than 12 months), how many days will the barrier be in days
place?
Will the barrier extend across the waterway from bank to bank?
Yes
No - how long is the proposed barrier (across the waterway)? metres
- how wide is the waterway (bank to bank)? metres
What is the purpose of the proposed barrier?
What is the maximum height of the proposed barrier above the existing bed level? metres
What are the proposed construction materials? (E.g. earth, concrete, rock fill, steel, timber, sand, etc.)?
Does the barrier follow the natural gradient of the bed level?
Yes
No
Does the application involve more than one barrier under this section?
Yes - generate another section 6 response for each barrier and submit with the application.
No - go to section 7.
Mandatory supporting information
7. Confirm the following mandatory supporting information accompanies this application.
Mandatory supporting information Confirmation of Method of
lodgement lodgement
Location details for all applications
IDAS form 27—Waterway barrier works
Version 3.2—3 August 2015
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.