Original source · versioned page text
Existing Council MCU RAL and OPW Approval
Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 12, section 1. The text section number identifies this passage in the reader.
Noosa Council documents
Total Suspended 80% reduction
Solids compared to an
unmitigated
development
Total Phosphorous 60% reduction
No increase in pollutant
compared to an
loads compared to a Vacant
unmitigated
Industrial Allotment
development
Total Nitrogen 45% reduction
compared to an
unmitigated
development
e. The finished surface levels of the swale alongside the western property boundary must be
such that all flows within the swale drain to the bioretention basin as per the MUSIC model
provided to Council on 7 November 2018.
f. The development must include bins with educational signage material to encourage patrons
who purchase items that generate gross pollutants to dispose of such items appropriately,
and not where they may enter stormwater systems.
g. Stormwater quality treatment devices must be routinely checked, serviced and cleaned in
accordance with Water by Design maintaining vegetated stormwater assets guidelines.
Records of all maintenance activities undertaken must be kept for 5 years and made
available to Council upon request.
h. The ongoing maintenance plan for the development must include the operations and
maintenance manual for the water quality device/s and must include the full cost of
maintaining the system. This maintenance plan must be provided at the Pre-Start meet
i. The development must not cause an increase in peak flow runoff in 1, 5, 50 or 100 ARI
events. The subsequent application for operational works must include calculations and
designs to demonstrate how this condition is achieved.
Water Sensitive Design
70. Prior to release commencement of use, the supervising RPEQ must certify must certify that
all hardstand areas of the development drain to a bioretention device designed and
constructed in accordance with all relevant conditions of this approval, the Water by Design
Bioretention Technical Design Guidelines, relevant aspects of the IPWEAQ Standard
Drawing WSUD-drawing series and Construction and Establishment Guidelines: Swales,
Bioretention Systems and Wetlands (Water by Design, 2009).
71. During construction and establishment of the bioretention devices, the supervising RPEQ
must certify forms contained in section 3.15 of the Construction and Establishment
Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2009). These
forms and certification must be submitted to council prior to the sealing of the survey plan.
72. The active filter media of the bioretention device must be as detailed inThe Stormwater
Management Report for Lot 5 Taylor Court, Cooroy Qld, 4563 report No 18-0165D Dated 7
November 2018 by HR Design . Active filter media area is the area of the bioretention basin
surface that is not covered by any impermeable structure such as a sediment forebay, riser,
etc.
Page 12 of 19
Document Set ID: 20742186
Version: 6, Version Date: 28/11/2018 Print Date: 28 November 2018, 4:15 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.