Existing Council MCU RAL and OPW Approval

of 87

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 13, section 1. The text section number identifies this passage in the reader.

Noosa Council documents




               73.    A construction hold point with a council delegate must be established once the bioretention
                      device underdrainage pipe work is installed. At the time of inspection, a sample of the
                      drainage layer, transition layer, and filtration media materials must be stockpiled onsite
                      accompanied by laboratory results that demonstrate that the media complies with the
                      specifications contained in the latest version of the Guidelines for Soil Filter Media in
                      Bioretention Systems (Facility for Advancing Water Biofiltration) and that the minimum
                      hydraulic conductivity of 180mm/hr or as specified on the approved engineering plans will be
                      achieved. The drainage layer, transition layer, and filtration media materials shall not be
                      installed until the catchment draining to the bioretention device has 80% groundcover as
                      determined by council’s delegate.
               74.    80% of the catchment flowing to the bioretention basin must be effectively stabilised prior to
                      the construction holdpoint for the Bioretention device.

                      Certification and Final Inspection
               75.    Upon completion of the work and prior to the final inspection by Council, a certificate must
                      be issued by an RPEQ certifying that the works have been constructed in accordance with
                      the Operational Works permit, the relevant engineering standards and best engineering
                      practices.

               76.    A final inspection of all the completed operational works by Council’s Inspector is required.
                      Please contact Council on 5329 6245 to arrange for the inspection.

                      Bio Retention Basins
               77.    Prior to Council accepting water quality treatment device assets “Off Maintenance”, the
                      applicant must provide Council with a Schedule of Maintenance Costs for all activities
                      undertaken to maintain the bio retention basins in accordance with the most current version
                      of Healthy Waterways Bio retention Basin Maintaining Vegetated Stormwater Assets
                      Guidelines. The schedule shall include records of actual costs of maintenance work
                      undertaken.
               LANDSCAPING
               78.    Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                          Plan No.          Rev.    Plan/Document Name                             Date

                          L001              D       Drawing Schedule and Sheet Layout 12.11.2018
                                                    prepared by James Birrell Design Lab

                          L002              D       General Notes prepared by James Birrell 12.11.2018
                                                    Design Lab

                          L003              D       Finishes & Plant Schedules prepared by 12.11.2018
                                                    James Birrell Design Lab AS AMENDED
                                                    BY COUNCIL

                          L601              D       Planting Plan prepared by James Birrell 12.11.2018
                                                    Design Lab

                          L602              D       Planting Plan prepared by James Birrell 12.11.2018
                                                    Design Lab AS AMENDED BY COUNCIL

                          L603              D       Planting Plan prepared by James Birrell 12.11.2018
                                                    Design Lab AS AMENDED BY COUNCIL



                                                                                                     Page 13 of 19
Document Set ID: 20742186
Version: 6, Version Date: 28/11/2018                                                           Print Date: 28 November 2018, 4:15 PM
Log in to download the original file

Existing Council MCU RAL and OPW Approval.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗