Noosa Council documents
Community Management Statement
18. Any proposed Community Management Statement required for the development pursuant to
the Body Corporate and Community Management Act 1997 must be submitted to Council for
endorsement at the same time as submission of the Building Format Plan (or similar) to
Council for compliance assessment.
19. All clauses and by-laws of the proposed Community Management Statement must accord
with the requirements of this Decision Notice.
Frontage Works
20. The length of the frontage of the subject site must be upgraded in accordance with the
Operational Works conditions and must include in particular:
a. Providing concrete pathway at minimum width of 1.2m along the frontage of the site
and be extended as may be necessary to achieve smooth connection and acceptable
transition with the existing pathway.
b. Providing pathway link 1.5 wide between the middle aisle and the proposed road’s
pathway, and be extended to a pram ramp or layback constructed at the kerb line.
c. Removal of any existing redundant property accesses and/or pram ramp and
reinstatement of the kerb & channel and verge area to match the balance of the site
frontage, including the provision of topsoil and turf where the existing verge is grassed.
Site Access and Driveways
21. Sealed access driveways must be provided generally in accordance with the approved plans
and in accordance with the Operational Works conditions of this permit. The works must
include in particular crossover in compliance with IPWEA Standard Drawings RS-051 for
commercial vehicle.
Car Parking
22. A minimum of 59 car parking spaces and 1 Heavy Rigid Vehicle loading bay must be provided
on the site in accordance with the approved plans and as required by the conditions of the
Operational Works conditions of this permit approval and must include in particular:
a. Sufficient turning area within the site to permit a vehicle to reverse from the parking
spaces and/or warehouses and exit the site in a forward gear in a total of 2 movements.
b. Crossfalls, gradients and dimensions in with Australian Standards AS2890:1 and
AS2890.2.
Stormwater Drainage
23. The site must be provided with a stormwater drainage system connecting to a lawful point/s
of discharge. The works must be carried out in accordance with the Operational Works
conditions of this permit approval.
Electricity and Telecommunication Services
24. Reticulated electricity, internal lighting and telecommunication services must be provided to
the site in accordance with the applicable standards and the requirements of the relevant
service providers. Certification/s must be submitted to Council from all relevant service
providers which certifies that the development has met the requirements of this Decision
Notice and all applicable legislation at the time of construction.
25. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
Easements
Page 4 of 19
Document Set ID: 20742186
Version: 6, Version Date: 28/11/2018 Print Date: 28 November 2018, 4:15 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.