26. Easements must be created over all existing and proposed public infrastructures within the
site if not already created unless approved otherwise in writing by the respective service
authority.
27. Any easements for services must be designed in accordance with the planning scheme or
the requirement of relevant service authority and granted at no cost to the Grantee. Where
the Grantee is Council or a service authority, the easement documentation must be in
accordance with the Grantee’s standard easement terms.
28. All building works and structures must be kept clear of any existing or proposed easements
on the subject land, unless agreed otherwise in writing by the Grantee.
RECONFIGURATION OF A LOT – RAL18/0013
When Conditions Must Be Complied With
29. Unless otherwise stated, all works required by the conditions of this Decision Notice must be
completed prior to submission of the subdivision plan to Council for compliance assessment.
Approved Plans
30. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
Drawing 1 - Access easement plan, Project Urban 25/07/2018
31. All lot numbering on the subdivision plan to be submitted to Council for compliance
assessment must remain as shown on the Approved Plans.
32. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
Boundary Encroachments
33. Certification must be submitted to Council from a Licensed Surveyor which certifies that:
a. all constructed access and roadworks (including associated fill batters and retaining
walls) are fully contained within a dedicated reserve or registered easement
b. all utility services and connections (eg. electricity, telecommunications, water,
sewerage) are wholly located within the lot they serve or alternatively included within
an easement
c. all existing effluent disposal areas are wholly located within the lot they serve and
comply with the boundary setback requirements of the Plumbing and Drainage Act
2002 and associated codes and requirements
d. all retaining walls and structures are fully contained within the lot they retain
e. any fill, including fill batters, are wholly contained within the subject site and not on
adjacent properties
f. for the community title scheme, the road pavement changes required by this Decision
Notice accurately demarcate the boundaries of the public and private land.
Community Management Statement
34. Any proposed Community Management Statement required for the development pursuant to
the Body Corporate and Community Management Act 1997 must be submitted to Council for
endorsement at the same time as submission of the subdivision plan to Council for
compliance assessment.
Page 5 of 19
Document Set ID: 20742186
Version: 6, Version Date: 28/11/2018 Print Date: 28 November 2018, 4:15 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.