Original PDF page 7, section 1. The text section number identifies this passage in the reader.

Noosa Council documents




               37.    To alleviate the potential of stormwater ponding in the parking areas during major stormwater
                      events and to allow for the possibility of blockage of the proposed grated pits, the retaining
                      walls along the edges of the parking areas, particularly along the western boundary of the
                      site, must be provided with sufficient gaps, opening or constructed at a specified height above
                      the finish levels in accordance with the directions and recommendations of
                      design/supervising engineer/s.
                      Prior to Commencement of Works
               38.    Any conflict between the development and an existing or proposed service must be referred
                      to the relevant service authority for determination prior to the prestart meeting.
               39.    Any filling and structural wall over an existing sewer main must comply with Unitywater
                      requirements. Where applicable, a written approval in this regard must be obtained from
                      Unitywater and submitted to Council prior to requesting the prestart meeting.
               40.    Council must be contacted at least 5 working days prior to any works commencing to
                      organise a prestart. The contact number to arrange a pre-start meeting is 5329 6245*. The
                      pre-start meeting must include the relevant parties for the following aspects of the works:
                      a.      Civil engineering works.
                      b.      Stormwater drainage works.
                      c.      Erosion and sediment control works.
                      d.      Landscaping works.
                      * Refer to Advisory Notes
               41.    At least 5 working days prior to any works commencing, written advice must be provided to
                      Council detailing:
                      a.      The name, contact details and ACN for the supervising Registered Professional
                              Engineer of Queensland (RPEQ) and Principal Contractor.
                      b.      Proposed dates for commencement and completion of construction.
               42.    The principal contractor must have all the appropriate insurance and public liability
                      documentation to carry out the works. The principal contractor is also responsible to ensure
                      that any subcontractors also have the appropriate insurance and public liability
                      documentation. Certificates demonstrating currency of public liability insurance and works
                      insurance covering the works must be submitted to Council prior to the prestart meeting.
               43.    Any changes to the details associated with the supervising RPEQ or Principal Contractor
                      during construction, must be notified to Council in writing within 5 business days of the
                      change occurring.
               44.    Condition report/s including photographs must be completed and submitted to Council prior
                      to the prestart meeting and prior to any works commencing:
                      a.      The leading road to the site (Taylor Court)
                      b.      The frontage of the site including kerb line.
                      c.      All fences and retaining walls bordering the site.
                      d.      Any existing works, buildings and structures on the adjoining properties that could
                              potentially be destabilised or impacted on by the proposed operational works.
               45.    A Construction Management Plan must be submitted to Council for approval prior to the
                      prestart meeting and must specifically address the following:
                      a.      Traffic Management during all aspects of the construct phase including:
                              (i)    A Traffic Management Control Plan in accordance with Manual of Uniform Traffic
                                     Control Devices (MUTCD) detailing all temporary signage and traffic control
                                     measures prior to construction commencing.




                                                                                                       Page 7 of 19
Document Set ID: 20742186
Version: 6, Version Date: 28/11/2018                                                            Print Date: 28 November 2018, 4:15 PM
Log in to download the original file

Existing Council MCU RAL and OPW Approval.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.