Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Existing Council MCU RAL and OPW Approval

of 87

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (16.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 8, section 1. The text section number identifies this passage in the reader.

Noosa Council documents




                              (ii)  Where applicable, details on the location of imported fill sources, the haulage
                                    route, type of vehicle to be utilised during filling operations and frequency of
                                    usage.
                                    NOTE: any damage to the existing road system as a result of haulage operations
                                    and construction works must be fully repaired at the developer’s expense
                              (iii) Maintenance of safe pedestrians and cyclists access across the frontage of the
                                    site both during daily construction and after daily construction has ceased for all
                                    stages of development.
                              (iv) Fencing to the site during the construction phase of the development.
                              (v) Providing safe and adequate parking arrangements for all machinery and cars
                                    during construction phase without adversely impacting on the traffic flows and
                                    traffic safety on the leading/local roads or shared access roads.
                      b.      Effective procedures and measures to minimise adverse environmental impact on
                              other properties and roads users including noise and dust emission.
                      c.      Maintenance and protection of water quality and existing drainage lines through the
                              construction site through the implementation of appropriate erosion and sediment
                              control measures (also refer to Erosion & Sediment Control conditions).
                      d.      Works programme identifying key components of the works and their respective
                              durations.
                      e.      Establishment of a communication and contact protocol with the neighboring owners,
                              to advise of construction times, impacts on traffic and services and other relevant
                              issues.

                      During Construction
                      General
               46.    All frontage works must match neatly with existing road and verge/footpath features. Where
                      required, additional works beyond the frontage may be required to provide an acceptable
                      transition to existing road and verge/footpath profiles.
               47.    Any damage caused to Council or public assets and/or common property assets as a result
                      of the development works must be repaired by the developer/applicant at no cost to the asset
                      owner at the following times:
                      a.      Where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      Where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
               48.    All operational works must be supervised by a Registered Professional Engineer of
                      Queensland (RPEQ) who is independent of the Developer and Principal Contractor, and they
                      must certify that all completed engineering works conform to the conditions of this
                      Operational Works permit and the intent of the engineering design.
               49.    All works must be constructed and work procedure undertaken in accordance with:
                      a.      The approved plans/documents and conditions detailed in this Decision Notice.
                      b.      All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines.
                      c.      Provision of the Work Health and Safety Act and such other legislation as is applicable
                              to workplace health and safety.
                      Pathways
               50.    A 1.2m wide new pathway shall be provided along the frontage of the site generally in
                      accordance with the approved plans and conditions of the MCU, and must comply with but
                      not limited to following requirements:



                                                                                                         Page 8 of 19
Document Set ID: 20742186
Version: 6, Version Date: 28/11/2018                                                              Print Date: 28 November 2018, 4:15 PM
Log in to download the original file

Existing Council MCU RAL and OPW Approval.pdf · 16.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.