Original source · versioned page text
2022-01-17 - GC Agenda - Item 6 - Attachment 1 - Noosa Council Community Satisfaction Survey 2021 by Market Facts Qld Pty Ltd
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Basic Services & Infrastructure Theme
Function/Responsibility Examples/Clarification
Road Construction Constructing new or upgrading existing roads
Road Maintenance Repairing potholes and damaged road shoulders; street sweeping and
verge mowing
Footpaths, Kerbing & Guttering Construction and maintenance of safe footpaths, kerbs and gutters
Street Lighting Funding the provision and upkeep of lights on Council streets/roads
Traffic Management Traffic planning, traffic lights, roundabouts, traffic `calming' and
directional signage
Parking Facilities Establishing parking policies, parking control, provision of or
assessment of requirement for on and off-street parking
Public Transport Either providing or ensuring the provision of an adequate system of
public transport
Drainage & Flood Mitigation Construction and maintenance of open and underground stormwater
drains, levee banks, division channels etc
Waste Management Garbage collection and disposal, waste minimisation (recycling and
composting), street bins
Community Health Inspection of restaurants/cafés/shops, mosquito/midge spraying,
cemeteries
Weighted Performance Index (in order of Importance)
Table 2 – Weighted TPI – Basic Services & Infrastructure
Theme 1 2021 Survey
Basic Services/Infrastructure Importance Performance Performance
Means Means Indexes
Waste Management 4.48 4.03 80.6%
Road Maintenance 4.41 3.22 64.4%
Drainage & Flood Mitigation 4.41 3.63 72.5%
Traffic Management 4.24 3.16 63.2%
Parking Facilities 4.23 2.84 56.9%
Road Construction 4.16 3.35 67.0%
Community Health 4.13 3.71 74.1%
Footpaths, Kerbing, Guttering 3.94 3.30 66.1%
Public Transport 3.91 3.18 63.6%
Street Lighting 3.89 3.56 71.3%
MEANS 4.18 3.40
Total Performance Index 68.06%
The weighted Total Performance Index (TPI) for Basic Services & Infrastructure is one number,
which sums up the whole interaction between Performance and Priorities (importance) for this
particular Theme.
In 2021, the actuality of the interaction between these two forces gives a result of 68.06%
(70.42% in 2019 and 69.91% in 2017) of what might have been achieved if Noosa were to
achieve perfect performance for every Responsibility Area.
Noosa Customer Satisfaction Survey 2021 MARKET FACTS (QLD) PTY LTD 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.