Original source · versioned page text
Att 5 - Preliminary Stormwater Detention
Attached to the e-mail Retail Bus Type 2 Shop & Salon, Multiple Housing Type 4 Conventional (2 units) & Boundary Realignment (3 lots into 3) - MCU18/0158 & RAL18/0017.
The Chief Executive Officer Noosa Council PO Box 141 Tewantin QLD 4565 10 September 2018 Attention: Development Services, Noosa Council RE: 34 Elm St – Preliminary Stormwater Management Layout A preliminary Stormwater Management Layout has been included as part of the application for the proposed development at 34 Elm St, Cooroy. The development will need to demonstrate non-worsening of peak flow discharges. It is proposed to demonstrate non-worsening of peak flows as part of a detailed Stormwater Management Plan to be submitted as part of an Operational Works application. The preliminary stormwater management layout attached to this application is designed to demonstrate that there is sufficient room available to accommodate the required stormwater detention system. The Brisbane City Council – Simplified Detention Storage Sizing Method, contained in Planning Scheme Policy for Infrastructure Design, Chapter 7 has been used to ensure that there is adequate allowance on site to install an effective non-worsening system. From experience, the Brisbane City Council deemed to comply solution tends to provide results that are oversized in the order of 50% to 100%. As such, using the Brisbane City Council – deemed to comply solution is estimated to provide an oversized solution that will be refined during the Operational Works Stage of the Development. The existing fraction impervious area for 34 Elm St is approximately 70%. The deemed to comply solution states “Sites with greater than 60% existing sealed impervious surfaces will generally not require stormwater detention because there is little change in peak flow, and redevelopment will often improve and augment older roof-water and stormwater drainage systems.” However, to provide a conservative solution, the site has been deemed to be a D3 site (which has an existing impervious area greater than 40% but less than 60%). A D3 site requires 120m3/ha of stormwater detention. Based on a site area of 2,014m2, the required stormwater detention required by the deemed to comply method is 24m3.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.