Tuesday, 10 June 2025 Our Ref: 22070 Your Ref: OPW25/0042 NOOSA COUNCIL PO BOX 141 TEWANTIN QLD 4565 ATTENTION: Daniel Epps Dear Daniel INFORMATION RESPONSE DEVELOPMENT APPLICATION FOR OPERATIONAL WORKS - EARTHWORKS AND STORMWATER 3 & 7 SERENITY CLOSE NOOSA HEADS QLD Further to Councils information request of 16 April 2025 and for the abovementioned development application we now respond to all of the information requested. In support of the response please find attached: • Amended plans (drainage layout, drainage cross section & external catchment) prepared by Alta Projects • Combined external catchment data • Channel base roughness comparison • Amended Overland Flow Assessment prepared by Engeny • Traffic Impact Assessment prepared by Colliers • Traffic Management Plan and Traffic guidance scheme prepared by Avada Traffic START INFORMATION RESPONSE Item – Stormwater Management Council has identified the following items relating to stormwater management, compliance with Condition 46 of the higher-order approval, and design of the overland flow path through the development. Information Required 1. Clarify how external catchment areas contributing to the sag in Serenity Close have been identified. It is noted that 6 Serenity Close (‘Elandra’) was assumed to drain mainly to Serenity Close and then through the site in the previous submission, but now has been excluded.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 4 pages
Page 2
Provide a table identifying each property fronting Serenity Close for the section of Serenity Close which grades to the sag and provide an explanation of how the direction of drainage for each property has been determined (in particular, where it is assumed to not fully drain to Serenity Close). Response ALTA advise that upon further detailed review it was found that ‘Elandra’ discharges runoff to internal Rapid Infiltration Pits (RIPs) sized for Q100 events and surcharging northward away from Serenity Close in the event of failure. Refer attached amended catchment drawing CA01 with tabulation of contributing external catchments and explanatory comments now added. Refer also collated set of catchment drawings for all developments along the northern side of Serenity Close serviced by RIPs. Note also that RIP infiltration capabilities have been conservatively ignored. 2. Clarify what design blockage values have been adopted for the stormwater inlets in the design case in the overland flow assessment. Response Engeny advise that blockage applied as per QUDM (field inlets 50%, which is applied to the rating curve for each pit). 3. Clarify what climate change assumptions have bene adopted in the overland flow assessment. It is suggested that SPP2-4.5 and a planning horizon of 2100 be adopted consistent with the current methodology of ARR. Response Engeny advise that the SPP2-4.5 and a planning horizon of 2100 have been adopted. Current climate has applied an uplift to the IFD’s as recommended recently by ARR. 4. It is noted that 1% AEP (2100) immunity for the staff facilities building is achieved by the use of a levee (block wall). It would be preferable if the levee was only used to achieve freeboard rather than 1% AEP (2100) immunity. Response ALTA advises that immunity to staff facilities will be provided by a concrete pathway adjacent to the ephemeral stream’ which maintains a minimum height of 1m above the adjacent stream base. The staff amenities area will have no openings (doors, windows etc) addressing the pathway or ‘ephemeral stream’. By way of better explanation see Section D1 now provided on amended drawing D03. 5. Provide further contours or sections in the location of RIP 3B and RIP 5 to demonstrate that surface levels or an overland flow path (which may be informal) will allow and surcharge flows from these devices to flow to a lawful point of discharge without impacting any of the development buildings or facilities.
Page 3
Response
ALTA advises that all discrete RIPs have been conservatively sized to contain up to 100 year ARI
events. Should RIPs fail or more intense storms be experienced overflow would be to adjacent
roadway (legal point of discharge).
In the absence of final landscape design ALTA is yet to finalise the exact levels and contours, and
suggest this could this be dealt with via a condition.
6. It is noted that a gabion rock wall is specified as the method of retaining along the edge of the
overland flow swale in places. Given the ability of water to seep into this type of retaining (large
voids), it is unclear if this method of retaining is suitable for the edge of a drainage channel and
if a more suitable method is available that provides better long term performance of the
channel and adjoining areas.
Response
ALTA advise that the proposed Gabion Walls would be constructed with a heavy geofabric filter
(Bidim A24 or equivalent) along their base and rear faces such that any water entering the gabions
would not export sand from behind or beneath the walls.
Gabions are frequently used in waterways for batter retention (see below link)
https://www.gabionbarriers.com/application/gabion-channel.html
Issue – Overland Flow Channel
The design of the Overland Flow Channel includes roughness assumptions consistent with
mown grass or rock at a maximum batter of 1:2. Council has concerns with the ability to
provide long-term stabilisation for a grass or rock 1:2 batter.
Information Required
7. Provide additional detail demonstrating how long-term stabilisation will be provided to the
batters of the Overland Flow Channel. The additional detail must be prepared by a suitably
qualified person (RPEQ) and include treatment options consistent with the current
hydraulic design assumptions of the Overland Flow Channel (i.e., turf or rock).
Where long-term stabilisation of the proposed 1:2 turfed/rocked batter isn’t achievable,
provide a revised set of drawings amending the Overland Flow Channel to include a
reduced batter (i.e., a 1:3 vegetated batter).
Response
ALTA advises that the modelled roughness co-efficients were consistent with mown grass (n=.035)
along the channel base with vegetated batters (n=.06) on one side and gabion walls on the other.
An additional run has now been completed with the base roughness coefficient increased to reflect
a vegetated treatment lest that landscape outcome be pursued. An additional channel flow depth
of less than 100mm resulted which is insignificant to the performance or freeboard of the channel
(see graph in attached Channel base roughness comparison).
Inspection of Figures C11 and C12 of the Engeny report suggests channel flow velocities less than
1m/second for 1% AEP flows (with 2100 climate change) where jute mat and landscaped batters
with grassed base are proposed.
Page 4
Such velocities are less than maximums suggested in QUDM table 9.05.3 for easily eroded soils
with 50% coverage and less than maximums recommended for vegetated channels in QUDM
table 9.05.1
The Ephemeral Stream area will enjoy interaction with hotel guests and will be regularly
maintained by hotel groundkeepers such that any damage after an overland flow event would be
promptly rectified.
ALTA notes that the stream analysis is conservative and completely ignores infiltration afforded by
RIPs located on existing external catchment sites.
Issue – Extent of Vegetation in Overland Flow Channel
The higher order development plans suggest that the trapezoidal channel will include
landscaping (beyond turf) in the Overland Flow Channel. This is Council’s preferred outcome.
However, the inclusion of vegetation within this channel is inconsistent with the current
hydraulic design assumptions and could lead to flow breaking out of the channel and cause
flooding.
Information Required
8. Confirm the Overland Flow Channel will be vegetated to achieve a natural channel
design and meet the required hydraulic design assumptions.
Response
ALTA has relied on the above response regarding hydraulic performance and suggest it
demonstrates that a grassed or vegetated channel with 1:2 batters would provide adequate
performance and stability.
Which channel landscape treatment is adopted is subject to a future landscape OPW application to
determine.
Item – Construction Traffic
A Traffic Impact Assessment has not been provided as part of the application material.
Council recognise that the haulage operations are likely to cause impacts to the local road
network and associated road infrastructure.
Information Required
9. Provide a Traffic Impact Assessment (TIA) to assess the impacts of construction traffic
associated with the prescribed works. The TIA must be prepared by a suitably qualified
person (RPEQ) with Traffic Management Design qualification, in accordance with the
Department of Transport and Main Roads Guidelines, and must include, but not be
limited to:
a. a Road Safety Audit;
b. Pavement Impact Assessment;
c. a Traffic Management Plan – the Traffic Management Plan must be developed in
accordance with the Queensland Manual of Uniform Traffic Control Devices
(MUTCD) and the Queensland Guide to Temporary Traffic Management (GTTM);
Page 5
d. proposed haulage route – including the scheduled duration of excavation/haulage
works, number of haulage vehicles exiting the site per hour, and the type of
haulage vehicle (i.e., truck or truck and dog); and
e. the receiving location(s) of the exported spoil.
Response
Refer attached Traffic Impact Assessment, Traffic Management Plan and Traffic guidance scheme.
END INFORMATION RESPONSE
Part 3: Information Request has now concluded, and the application is now in Part 5: Decision.
Should you have any questions with respect to the above, please do not hesitate to contact me
direct.
Yours faithfully
PROJECT URBAN
Scott Sobey
DIRECTOR
Email: [email protected]
Used in these records
Response to Information Request Letter 10-6-2025.pdfRelated documentApplication case desk ↗
About this file
- File size
- 437 KB (small file)
- File type
No other editions are linked here.