Council archive · source document
Response to Information Request Letter 10-6-2025 · OPW25/0042
Provide a table identifying each property fronting Serenity Close for the section of Serenity Close which grades to the sag and provide an explanation of how the direction of drainage for each property has been determined (in particular, where it is assumed to not fully drain to Serenity Close). Response ALTA advise that upon further detailed review it was found that ‘Elandra’ discharges runoff to internal Rapid Infiltration Pits (RIPs) sized for Q100 events and surcharging northward away from Serenity Close in the event of failure. Refer attached amended catchment drawing CA01 with tabulation of contributing external catchments and explanatory comments now added. Refer also collated set of catchment drawings for all developments along the northern side of Serenity Close serviced by RIPs. Note also that RIP infiltration capabilities have been conservatively ignored. 2. Clarify what design blockage values have been adopted for the stormwater inlets in the design case in the overland flow assessment. Response Engeny advise that blockage applied as per QUDM (field inlets 50%, which is applied to the rating curve for each pit). 3. Clarify what climate change assumptions have bene adopted in the overland flow assessment. It is suggested that SPP2-4.5 and a planning horizon of 2100 be adopted consistent with the current methodology of ARR. Response Engeny advise that the SPP2-4.5 and a planning horizon of 2100 have been adopted. Current climate has applied an uplift to the IFD’s as recommended recently by ARR. 4. It is noted that 1% AEP (2100) immunity for the staff facilities building is achieved by the use of a levee (block wall). It would be preferable if the levee was only used to achieve freeboard rather than 1% AEP (2100) immunity. Response ALTA advises that immunity to staff facilities will be provided by a concrete pathway adjacent to the ephemeral stream’ which maintains a minimum height of 1m above the adjacent stream base. The staff amenities area will have no openings (doors, windows etc) addressing the pathway or ‘ephemeral stream’. By way of better explanation see Section D1 now provided on amended drawing D03. 5. Provide further contours or sections in the location of RIP 3B and RIP 5 to demonstrate that surface levels or an overland flow path (which may be informal) will allow and surcharge flows from these devices to flow to a lawful point of discharge without impacting any of the development buildings or facilities.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request Letter 10-6-2025.pdfRelated documentApplication case desk ↗
About this file
- File size
- 437 KB (small file)
- File type
No other editions are linked here.