Decision Notice - 010.2007.00001294.001 [As Published] · 142007.1294

of 9

Text shows just the words. Original shows the document exactly as it was published.

NOOSA COUNCIL IDAS Development Application Decision Notice                                                     4 of 9


6.     The pathway and road pavement in Hastings Street adjacent to the entrance to the work site shall be
       swept clean at regular intervals. The works shall be undertaken under traffic control where applicable.

7.     Excavation of the site and the construction of the proposed works shall not have any adverse affects on
       the stability of adjoining buildings and/or structures and/or services and/or lands. In this regard a
       Registered Professional Engineer Queensland shall supervise the excavation of the site and the
       construction of the new works to determine whether any additional measures are required to protect the
       stability of adjoining buildings and/or structures and/or services and/or lands.

8.    The use of vibratory equipment of any kind is not permitted to be used (including vibrating rollers and the
      use of vibrating installation techniques for sheet piling and other construction vibrations caused by
      excavating, earthmoving or demolition machinery or other similar construction techniques) unless
      approved and supervised by a Certified Geotechnical Engineer. Under such circumstances the operator of
      such equipment shall at all times comply with the directions of the Geotechnical engineer and the
      reasonable and lawful directions of Council officers.

9.    All parts of the works (including excavation, retaining structures, tie backs etc) are to be wholly contained
      within the subject site. Any subground structures (support anchors, tie backs etc) to be utilised into
      adjoining properties, shall only be used if written permission has been granted by the adjoining property
      owners.

10.   Certification of the completed works must be provided to Council by the supervising engineer. The
      certification shall state that the completed works conform with all aspects of the design and that the
      completed works will not have any adverse affects on the stability of adjoining buildings and/or structures
      and/or services and/or lands.

11.    Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily installed into the
       first existing external downstream stormwater structure.
       These devices are to be checked and cleaned on a regular basis and specifically after each rain event.

       These devices are to remain in place during the civil works and construction phases of the development.

       The location and type of device to be installed shall be established at the “pre start” meeting with
       Council’s Construction Technical Officer and shall be installed prior to the commencement of any works.
12.    Council’s Construction Technical Officer – Michael Conroy (ph 0410 512 505), shall be given seven (7)
       days’ notice of intention to commence works to arrange a “pre start” meeting prior to the commencement
       of works.

13.    The principal contractor must have all the appropriate insurance and public liability documentation to carry
       out the works. The principal contractor is also responsible to ensure that any sub contractors also have
       the appropriate insurance and public liability documentation.

14.    Prior to the “pre start” meeting, the principal contractor must be provided with a copy of Council’s
       signed approved drawings and conditions by the applicant.

15.    The Consulting Engineers for the project shall be currently Registered Professional Engineers of
       Queensland (RPEQ). The consulting engineers are responsible for arranging all inspections, with
       Council’s Construction Technical Officer or nominated staff. Council’s Construction Technical Officer shall
       provide an inspection form for signing off by the Engineer at appropriate stages of construction, during on-
       site meetings. Construction Technical Officer will also sign the form at each stage when conditions
       required have been satisfied. The works will be accepted “On Maintenance” after this form, signed by the
       inspector for each stage is complete, together with a letter from the Engineer requesting that the works go
       “On Maintenance”.

16.    Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the project.
       (This person will be the contact for the project).

17.    Council standards shall apply to these works unless otherwise modified herein.

18.    The person acting on this permit shall ensure that its consultants and contractors take all reasonable care
       during the construction of the engineering works to ensure that Council property, road pavements or
       facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, street
       furniture etc.) are protected against any damage or interference whatsoever.




NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@4c0966ee\@[email protected]

Used in these records

About this file

File size
38 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00001294.001 [As Published].pdf · 38 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.