Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Decision Notice - 010.2007.00001294.001 [As Published] · 142007.1294

of 9

Text shows just the words. Original shows the document exactly as it was published.

NOOSA COUNCIL IDAS Development Application Decision Notice                                                    5 of 9


       If any Council property or facilities should be damaged by the Applicant or any of its Consultants or
       Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
       engineering works, the Applicant and/or its Contractors shall forthwith notify the Manager Land
       Development and shall forthwith rectify the damage to that property or facility at its cost and to the
       satisfaction of the Manager Land Development.

       All rectification works are to be completed prior to the commencement of the use or, alternatively, the
       Applicant may request the Council to carry out the rectification work at the Applicant’s cost, such cost
       being paid by the Applicant to the Council prior to the commencement of the use.

       In the case of any emergency the Council shall be entitled to rectify such damage at the cost of the
       Applicant, such cost being paid prior to the commencement of the use.

19.    The development of the site shall be carried out in such a manner as to prevent dust and/or sand
       nuisance to residents and/or tenants in the vicinity of the development.

20.    Construction work and other associated activities are permitted only during the hours of 7.00 am and 6.00
       pm Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended
       hours are approved by the Manager-Land Development or his nominee.

21.    All signage, including that for safety during construction shall be in accordance with the Manual of Uniform
       Traffic Control Devices and Traffic Infrastructure (Roads) Act.

22.    Safe pedestrian access on Hastings Street and beachfront pathway shall be maintained at all times.
       Should footpath / road closures be necessary to carry out construction works, Council’s Construction
       Technical Officer (ph 0410 512 505) must be notified prior to the proposed closure.

23.    Sediment and erosion control measures must be in place prior to works commencing. If such measures
       are not in place or are not satisfactory, “on the spot “fines may be issued. Such fines can be issued if
       sediments from the site are found to enter or have the potential to enter Council’s stormwater system or
       natural waterways. Although the sediment and erosion control measures have been approved on drawing
       No. 1703-0-4, Council’s Manager – Land Development may request further controls to be installed should
       approved measures be inefficient.

24.    The owners of the subject property shall maintain the grease/oil arrestor pits/gross pollutant traps in
       accordance with the manufacturers specifications.

25.    The owners of the subject property shall inspect the grease/oil arrestor pits/gross pollutant traps on a
       weekly basis and after each storm event.

       The owners of the subject property shall enter into an ongoing maintenance contract with a Registered
       Contractor to clean and maintain the grease/oil arrestor pits/gross pollutant traps on a regular three
       monthly cycle and on a “On Call” basis in the case of an emergency.

       The management and maintenance of the grease/oil arrestor pits/gross pollutant traps shall be included in
       the Community Management Scheme for the completed development.

26.    All stormwater drainage lines including private drainage lines (also known as inter-allotment drainage
       lines) or as otherwise approved by Council’s Manager of Land Development shall be inspected by closed
       circuit television (CCTV) at the completion of all works and immediately prior to acceptance ‘On
       Maintenance’. Council’s Construction Technical Officer shall be advised of the timing of this inspection.
       A report of the CCTV inspection, including photographic records (which includes photos & video
       recordings burnt onto a CD) of the inspection shall be submitted to the Council for approval. Any defects
       or substandard works shall be recorded and accurately illustrated on the drainage plan showing the
       location of the defect(s).
       Substandard work will not be accepted ‘On Maintenance’ and must be rectified at the applicants expense
       with a further CCTV inspection arranged once the rectification works have been completed.
       To this extent all CCTV inspections, including any additional inspections necessary following defect
       identification and rectification, shall be entirely at the applicant’s expense. Any costs incurred by Council
       in reviewing the CCTV inspection results shall also be borne by the applicant.

27.    Prior to acceptance of drainage and pathway restoration works "On Maintenance", the lodgement of
       satisfactory “As Constructed” records of the drainage works shall be submitted to Council.




NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@4c0966ee\@[email protected]

Used in these records

About this file

File size
38 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00001294.001 [As Published].pdf · 38 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.