NOOSA COUNCIL IDAS Development Application Decision Notice                                                    6 of 9


       As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer (RPEQ) for
       design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all
       services and structures. All of which shall be submitted to Council for checking and for Council’s records.
       The data must fully detail levels for all engineering works including but not limited to drainage structures,
       finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and
       As Constructed (ADAC) digital format.            (Guidelines on the use of ADAC are available at
       www.adac.com.au) and Council’s Planning Scheme Policy 5 – Engineering Design Standards – Roads,
       Drainage and Earthworks.
       Approval of works shall not be granted until all As Constructed information has been supplied and
       accepted by Council.

28.    A 5% cost of footpath restoration works to become Council assets or $1,500 bond (whichever is the
       greater) will be imposed on construction works during the maintenance period, which is a minimum period
       of 12 months duration. Such bond must be lodged by, and shall only be accepted from the Developer for
       the works.

29.    The works to become Council assets will not be accepted "On Maintenance" until the landscaping is
       completed.

30.    These works are also to be in compliance with the relevant conditions of Development Permit No.
       2007/1181.

31.    Pursuant to Section 3.5.21(5) of the Integrated Planning Act 1997, the Relevant Period is two (2) years
       from the day this permit takes effect (28 February 2010) during which time all conditions must have been
       complied with and the Plan of Survey lodged with the Council for endorsement.

32.    Notwithstanding that Council has checked the plans with due care, where it is found during construction
       that variations from Council's standards exist, then Council standards shall apply.




NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@4c0966ee\@[email protected]

Used in these records

About this file

File size
38 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00001294.001 [As Published].pdf · 38 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.