Original source · versioned page text
change to the approval - clubhouse use
Noosa Council documents
NOOSA COUNCIL IDAS Development Application Decision Notice 7
45 The Regional Manager, Cultural Heritage Program, Southeast Region, Environmental Protection
Agency should be contacted immediately on (07) 3225 8426 should any cultural artefacts be exposed
during construction.
46 The proponent should give some consideration to rehabilitating the existing and proposed waterway
features, to a more natural state, by the use of native fauna and flora. The Southern Fisheries Centre
(Mr Bob Simpson, (07) 3817 9590 may be contacted for advice on stocking native fish.
47 The clubhouse is limited to a size of 280m². Any future application for the granting of a Liquor Licence
should be limited in the hours of the licence to not later than 10pm Monday to Sunday, to minimise the
potential impacts on surrounding residences. The clubhouse is not permitted to operate after 10pm
daily and is not to be utilised as a Function Room.
48 The development must be undertaken and operated in a manner that causes no detrimental effect upon
the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or
other emissions.
49 The open space and setback areas are to be landscaped in accordance with Council’s Policy on
Landscaping Guidelines and a properly prepared landscape plan. Such landscaping is to be completed
prior to the commencement of the golf course component of the use and maintained at all times
thereafter to the reasonable satisfaction of the Director of Environment & Planning.
50 Existing trees on the site and within road reserves are to be retained, except where required to be
removed due to building operations or the conduct of the approved use. The landscape plans referred to
above are to denote areas of existing vegetation or existing trees proposed to be retained.
51 Any advertising sign or device is to comply with the provisions of Council's policies on advertising.
52 The developer must submit security in the form of a cash bond or trading bank guarantee to the sum of
$20,000 to secure performance of all conditions of this approval, prior to the issue of a Development
Permit for building works. The cash bond or trading bank guarantee will be returned on performance of
the conditions of approval less any costs incurred by Council in respect of enforcing performance of this
permit.
53 The requirements of this development approval are to be effected, prior to the use of the premises.
Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect
compliance with conditions.
54 This Development Permit for a material change of use of premises lapses if:-
54.1 the use or erection of a building or other structure associated with the use, has not been
commenced within four (4) years of the date of issue of the Development Permit, unless
application is made and approved by Council for an extension; or
54.2 the use of any premises pursuant to the Development Permit ceases.
55 Prior to the commencement of development, the developer must obtain the following Development
Permits:-
55.1 Development Permit for building works;
55.2 Development Permit for plumbing and drainage works;
55.3 Development Permit for operational works of landscaping, carparking and access;
55.4 Development Permit for reconfiguring a Lot (amalgamation)
The developer must obtain all of the other Development Permits referred to above, prior to obtaining a
Development Permit for building works, unless the Council agrees otherwise.
SMP o:\database\ipa\town planning\decision.doc
Print Date: 7 September 2021, 10:32 AM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.