NOOSA COUNCIL IDAS Development Application Decision Notice 6
The notification period to Council of the completion of eradication works shall be a minimum of thirty
(30) days. The Applicant is advised that Council's Noxious Weeds Officer will not undertake an
inspection the development site until after this notification period has expired.
33 As part of the application for a development permit for operational works, details for rehabilitation of the
dam and waterway areas by the use of native fauna and flora shall be included.
34 All suitable native trees shall be retained. Details of retained trees shall be submitted with any
application for a Development Permit for Operational Works.
Particular care shall be given not to interfere with the natural ecology around retained trees likely to
cause stress to these trees.
35 The existing vegetation on the site shall be retained except where required to be removed to enable
construction of roads, accesses or pegging of surveyed boundaries. Particular care shall be taken not to
disturb vegetation adjacent to existing creeks and watercourses.
36 Prior to commencement of any operational works arising out of this permit, security in the sum of
$25,000 must be lodged with Noosa Council, to secure performance of conditions of this approval
relating to works external to the site. The security shall be in the form of cash or unconditional trading
bank guarantee acceptable to the Manager-Land Development.
The security will be returned upon satisfactory performance of all relevant conditions of this approval
and any other related development permits for operational, less any costs incurred by Council in
ensuring compliance with these conditions or for any additional inspections incurred for substandard
work or works undertaken not in accordance with this permit.
37 The requirements of ENERGEX, OPTUS and TELSTRA shall be satisfied in relation to any existing
services which currently traverse the development site. Written confirmation by the relevant authorities
that satisfactory arrangements have been made to formalise any existing informal services shall be
submitted prior to commencement of the use.
38 All stormwater drainage shall be designed in accordance with the provisions of the 1987 Australian
Rainfall and Runoff (A.R.R.), Australian Standard AS3500.3.2-1998 ‘Stormwater Drainage-Acceptable
Solutions’ and Noosa Council Standards. Pipe and channel drainage systems shall be designed to
cater for ten (10) year Average Recurrence Interval design storm for Kabi Road.
39 The water quality of any water originating from and leaving the site shall not vary by more than 5% from
the baseline data for water currently leaving the site measured in the north eastern area of the
development site. Monitoring of water quality in the dams shall be undertaken monthly during
construction and annually during operation.
40 A water quality control plan shall be included in the EMP and once approved, shall be complied with at
all times.
41 Stormwater drainage shall include measures to protect proposed allotments from run-off from
surrounding land. The design shall also address controls for gross pollutants, nutrient runoff, oil and
grease, and silt and sediment.
Underground stormwater systems shall be designed in accordance with Noosa Council’s Engineering
Design Standards, and shall be connected, where possible to Council's existing drainage systems.
An easement of minimum width 4.0 metres shall be granted in favour of Council over any stormwater
pipes that traverse private property.
Designs that concentrate stormwater onto adjoining land shall require separate formal approval from
the owner of the land or relevant Government Authority. Such approval shall be submitted with the
design in conjunction with an application for a Development Permit for Operational Works.
Town Planning
42 Development undertaken in accordance with this approval must generally comply with the approved
plans of development. The approved plans are numbered No. G177.DCP.02 Figure 3 prepared by GNP
Golf Design Pty Ltd and dated May 1998 and as may be amended by these conditions.
43 The approval of the Sport and Recreation (golf course) component of the Integrated Permaculture
Designed Organic Orchard and Golf Course Complex, is only valid for as long as the Agriculture use
(Permaculture) is undertaken on the site. The Sport and Recreation ( Golf Course) use, and ancillary
uses, lapse if the Permaculture use ceases on the site.
44 The owner/operators of the proposed development are required to be members of the Biological
Farmers of Australia. Accordingly there is not be any use of non organic chemicals on the site.
SMP o:\database\ipa\town planning\decision.doc
Print Date: 7 September 2021, 10:32 AM