55. The existing sewer main that shall be relocated along the side boundary and the outer limits of the
proposed conduit shall be accurately located and determined by a licensed Surveyor and shown on all
plans submitted for Operational Works approval.
To ensure Council’s sewer main is accessible for maintenance purposes and is protected from risk of
damage no structures requiring a building permit (eg. buildings, retaining walls, etc) shall be constructed
within this ‘zone of influence’ ie. the edges of the conduit, and as such the applicant shall amend
Operational Works plans including Building plans to ensure compliance.
Town Water Supply
56. The site shall be connected to Council’s existing town water supply and be constructed in accordance with
Council’s standards and requirements at no cost to Council.
57. Each water connection to the water reticulation system shall extend to the property boundary and be
metered. Where multiple units including leased buildings are served by a single service, multiple water
meters to each individual unit or leased building shall be installed. All fees for the supply of water meters
shall be paid to the Council.
Service Easements (Sewer)
58. A registered easement shall be created over the zone of influence, that is the limits of the proposed
conduit chamber of the relocated sewer within the subject site and over those parts of the subject site that
are impacted upon by sewers on any adjoining sites. In this regard a licensed surveyor shall accurately
locate all sewer mains and determine the necessary width of the easement, which shall be shown on any
plans submitted for Operational Works / Building Works approval. To this extent the surveyor shall certify
that the sewer and the zone of influence is wholly contained within the easement to be created.
In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in
writing that the Title Deed and the easement documents will be lodged at the Land Titles Office and any
additional Titles Office forms or requisitions requiring the consent of Council will be attended to promptly.
A duly executed copy of the easement shall be submitted to Council for perusal prior to the use
commencing.
Any changes required by Council’s Solicitor must be corrected immediately.
59. A registered easement shall be created over any stormwater drainage pipes within the site that collect
stormwater from a Council road or convey stormwater from any adjoining property (for example, where
drainage pipes are provided within the site to prevent adjacent properties from additional ponding/flooding
due to the subject site being filled).
60. No building or other structure shall be constructed or encroach over an easement. Any building or
structure within proximity of an easement or any other public utility’s underground must have its
foundations designed so that no surcharge loads are imposed upon such underground infrastructure.
Foundations must be taken down a minimum of 1.0m below a line of influence measured 1.0m in the
direction of the foundation from the centreline of the closest underground service and along the natural
angle of repose of the foundation soil type(s).
Plans, and supportive documents, detailing these proposed foundations shall be designed by a registered
practicing Geotechnical Engineer and submitted with the application for a Development Permit for
Operational Works.
Headworks Contributions
61. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28 and PSP30
on Water Supply Headworks Contributions and Sewerage Headworks Contributions respectively and at
the rates applicable at the time of payment. An estimate only of the contribution rates under the current
policies is outlined below. These amounts will adjusted in line with changes to the Consumer Price Index,
All Groups Brisbane from December 2005 until the date of payment.
Water Supply $6,953
Sewerage $7,670
TOTAL $14,623
All headworks contributions must be paid prior to the issue of a Development Permit for Operational
Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the headworks
contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled,
the contribution or trading bank guarantee will be returned.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@4c044668\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Compiled Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 78 KB (small file)
- File type
No other editions are linked here.