NOOSA COUNCIL IDAS Development Application Decision Notice                                                        7


44.   The existing open concrete channel running along the base of the retaining walls of adjoining properties
      on the southern boundary of Lot 2 RP102593 and at the rear boundary of Lots 1&2 RP102594 and Lot 2
      RP102593 shall be replaced by piping to drain any areas of the site or adjoining lots that pond due to
      proposed filling.

45.   Roof runoff from any new dwelling shall be directed to a rainwater storage system or tank (minimum
      storage 3000 litres per dwelling unit) that is plumbed to service the toilets in the new dwelling and
      landscaping areas. The design of the rainwater storage system shall be to the satisfaction of the Manager
      Plumbing Services.

46.   As the site is proposed to be filled, appropriate stormwater drainage pipes shall be installed within the site
      to collect and discharge stormwater runoff from all adjoining properties to prevent additional
      ponding/flooding on these properties.

47.   Drainage of the site shall be in accordance with the principles of Council’s - Noosaville Master Drainage
      Plan to ensure that the site discharges to the appropriate drainage catchments. This information can be
      obtained from Council’s Technical Officer - Development, by contacting 5449 5263.

48.   To ensure that polluted run-off does not enter Council’s stormwater drainage system, stormwater run-off
      from the carparking areas and the driveways shall have the first flush (the first 12 mm of rainfall or hose-
      down) collected in a grease/oil arrestor provided on site prior to being permitted to discharge into
      Council’s drainage system.
      All other clean stormwater, such as roof water, can be collected on site and discharged through a single
      underground drain line directly into the existing drainage system, bypassing the grease/oil arrestor.
      To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil arrestors, which
      shall be submitted to the Council for approval prior to obtaining a Development Permit for Operational
      Works.
      The approved maintenance plan shall be incorporated in the Community Management Scheme for the
      development and a copy of this shall be provided for Council’s records prior to commencement of the
      approved Use.
      A Development Permit for Building Works shall not be granted until a Development Permit for Operational
      Works has been issued in regard to the drainage scheme.
49.   All site stormwater drainage shall be by means of a gravity system.

50.   All stormwater drainage lines including inter-allotment drainage shall be inspected by closed circuit
      television (CCTV) prior to commencement of the approved Use.
      CCTV inspection will be carried out by Council's CCTV contractor and arranged by Council following
      satisfactory completion of construction works. The developer will be responsible for the full cost of CCTV
      inspection, including any additional inspection necessary following defect identification and rectification.
      This charge is payable prior to the issue of Operational Works approval and will be determined on the unit
      rate basis current at the time of approval.
Stormwater Drainage Contributions
51.   A contribution of $16,176 shall be paid to Council towards the cost of the Noosaville Master Drainage Plan
      prior to obtaining a Development Permit for Operational Works. The amount of the contribution shall be
      adjusted in line with changes to the Consumer Price Index, All Groups Brisbane from December 2005
      until the date of payment.

Sewer Mains

52.   The site shall be connected to Council’s existing sewerage reticulation systems and be constructed in
      accordance with Council’s standards and requirements at no cost to Council.

53.   Sewer relocation works shall be in accordance with Construction Hydraulics Drawings 1470-S-1 and
      1470-O-2 and Noosa Shire Council Planning Scheme Policy 6, Engineering Design Standards, Water &
      Sewerage.

54.   Sewer relocation works are to be completed prior to the commencement of any buildings works on the
      site.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@4c044668\@[email protected]

Used in these records

About this file

File size
78 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Compiled Decision Notice [As Published].pdf · 78 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.