SUPERSEDED - Decision Notice 132005 638 03
13. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particulate matter escapes onto a public road. All vehicles carrying materials either
to or from the site shall be covered to prevent materials including dust being windblown from
the vehicle.
Additional conditions 15 February 2024
14. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
the use commencing, and then compliance maintained at all times while the use continues.
Approved Plans
15. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table/s below. The plans must be amended to incorporate
the amendments listed within the table below and resubmitted to Council prior to the
commencement of any works commencing on the site.
Plan No. Rev. Plan/Document Name Date
501042 CO2 A Proposed site layout plan prepared by 7/12/2023
Noosa Council
501042 CO2 A Proposed offset planting plan prepared 7/12/2023
by Noosa Council
JOO352R1V2 - Noosa Landfill RRA flood Assessment 6/04/2022
prepared by Hydrology and Water
Management Consulting
The following plans require amendment.
Plan No. Rev. Plan/Document Name Date
<R2015 B Noosa Landfill – Stormwater 7/12/2023
Management Plan prepared by Topo
▪ Update the report to reflect the current masterplan for the
Amendments
site and the specific changes for the site encompassed by
the application
▪ Specify the final HES basin detail from the range of options
presented in the report, including consideration of whether
a Type-B HES basin may present a lower-risk option
compared to the flap-gated arrangement proposed to
prevent back-flows into the Type-A arrangement as
currently proposed
▪ Include all details for the sizing and proposed levels of the
HES basin within the body of the report, based on recent
detailed survey at the point of discharge and downstream;
and
▪ Include construction-phase erosion and sediment control
plans which document how the transition from the current
HES basin location to the ultimate location (including filling
for the RRA pad) will be achieved
*(Refer to Advisory Note)
Page 3 of 23
Document Set ID: 23023312
Version: 9, Version Date: 22/05/2024