SUPERSEDED - Decision Notice 132005 638 03

of 23

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                      Nature and Extent of Approved Use
               16.    This development permit authorises a Utility Installation (Waste disposal and recycling
                      facility) to be established on the site. The subject use is limited to waste management and
                      ancillary activities associated with the primary use occurring on the site.
               17.    The landfill waste management activities must not extend outside the designated use areas
                      as shown on the approved plans. Signage is to be placed along the northern, eastern, and
                      southern boundaries of the approved use areas to assist in delineating the edge of the
                      approved use areas and surrounding bushland.
               18.    This approval does not approve any new building or structures within the resource recovery
                      area except for any fencing or signage permitted as part of this approval.
                      Public safety
               19.    Public signage must be erected along all internal roads to assist the public navigate through
                      the site, in particular the resource recovery area.
               ECOLOGY AND ENVIRONMENT
               20.    A detailed Offset Delivery Plan (ODP) must be developed in accordance with the
                      Environmental Offsets Act 2014. The development must offset a minimum 500 non juvenile
                      koala habitat trees (the impact) at the ratio of 6:1 to satisfy the State Government Supported
                      Infrastructure Koala Policy 2017.The ODP shall include details such as species composition,
                      planting density, planting methodology, annual reporting and include a minimum 5-year
                      maintenance for the proposed 1.8ha Offset area.
               21.    Certification must be submitted to Council from a qualified person* which certifies that the
                      subject works have been undertaken in accordance with the approved Offset Delivery Plan
                      prior to the commencement of the use of the additional area.
                      *(Refer to Advisory Note)
               22.    Construct a minimum 1.8m temporary fence around the operational areas of the landfill to
                      prevent rubbish from leaving the landfill area and depositing in the adjoining bushland.
               23.    A Weed Management Plan must be prepared which addresses weed management along the
                      interface of the proposed earthworks footprint with bushland areas, including but not limited
                      to a minimum 5m grassed buffer area between the proposed resource recovery and the
                      adjoining vegetation to the north. Control of all weed species listed in the following standards
                      and legislation must be undertaken:
                      a. Declared plants under the Land Protection (Biodiversity Act 2014 and subordinate
                         Regulation 2016)
                      b. Council’s Biosecurity Plan 2020 pest plants listed in schedule 1 part 3, schedule 2, and
                         nonscheduled invasive species.
               24.    The requirements and recommendations of the approved weed management plan must be
                      implemented. Certification must be submitted to Council from a qualified person* which
                      certifies that the subject works have been undertaken in accordance with the approved Weed
                      Management Plan.
                      *(Refer to Advisory Note)
               25.    A Sediment and Erosion Control Plan must be prepared by a suitably qualified person*.
               26.    The sites supervising engineer must ensure that the sediment and erosion control measures
                      have:
                      a.      Been duly designed by an RPEQ or CPESC and constructed in accordance with "best
                              practise" methods,
                      b.      Been revised by an RPEQ or CPESC to address the issues raised by changes in the
                              projected construction schedule and/or methods,
                      c.      Been revised to address predicted rainfall events, and


                                                                                                       Page 4 of 23
Document Set ID: 23023312
Version: 9, Version Date: 22/05/2024
Log in to download the original file

SUPERSEDED - Decision Notice 132005 638 03.pdf · 1.0 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.