INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 22 JULY 2014
Page 15 of 49
a NOOSA NOOSA COUNCIL - PROJECT DESIGN & DELIVERY 2013-2014 [STAGE —~S«Y
COL NCII
[= |-ReeeE EE eMiith
30 June 2014 Os
——BRIDgES
| eee Oe eee eee Level 3 Inspections to Witta, Sheraton, Doonélla completed. Testing by Specialist testing consumiant completed. Timber bridge
Inspections In progress. Ongoing program into 14/15.
[aaa OO Eee Tender preparaion in Gram process open between 1 July and 26 August (cannot tender prior to oufcome of grant
applications). 30t load Emit to each lane to be applied during constuction & vessel limit In vicinity of works - MSQ have been
contacted. Tender process and construction to carry over into 14/15.
COASTAL, CANALS & WATERWAYS
David Low Way, Beach Access 49 refurbishment —— eee exe fe oe a eae pare SEY
Gymple Terrace and Wiliam Street revetment wail and pathway rehabilitation $50,000 es Pe Dallas Sickiey
[ees Pan a Pa SEE SESE_ceay, "| eyanccower | omaurs | ora ssomme sis mest ee [DaveShing =i “<asassCédProgectcarmiecovertoi4is. eet
Noosa Dog Beacn Shoreline Erosion Management Pian Coastal Monitoring Bryan OConnor oe Dave J
| [Nees River Mouth groyne and rock wail rehabilitation Bryan OConnor | ‘eras fetcacoe |
ee — = as er $123,387 po 7 Ppa Dave Shing Works In progress. Stage 1 works complete. Critical sections of Stage 2 In Western lake completed. Stage 3 works to be
$1,289,259
| [coset quatoweren uard tower rehan paw | ft | a carried out in future maintenance years. Project to be continued into 14/15.
COMMUNITY FACILITIES
a lao poss | ideeaeieleeiheiieieieliain Ce ee ee ee al
HOLIDAY PARKS
iceiiseiieeieiaeeeiaeeeneeniiaall reef tf free fr fr rex —foge t+ + tt 14 Allan Hazell
SSS ee Fe Fe FU
ENVIRONMENTAL
|| Purchase of biodiversity land eet UTC EHS SE EE Oh LO
IT MAJOR PROJECTS
| | IT MAJOR PROJECTS aw Te} Fe ree ee Pe Pe ee ee
A detay with the implementation of Board and Minutes Manager (BAMM) program has caused this project to overrun.
PARKS & PLAYGROUNDS
| |cooray Skate Part Refurpisnment | osesanaercn | woos | roorae | soxcco | saxcoo | sososo | so | sasoso fT es Dallas Sickiey
| [eres Toe Penta Ratatat | ee centeeen | commis | soars | sno | sumo | soe || ee ee Dallas Sickiey Cee en]
freee eee ES ES ES SE ee EH HH HES Dallas Sickiey
[oes sss ns Pan wacvaownarss _———SSC*diCee naman | ewe | voor | soon | soo | sav | snea | sana (PT [|
— pessareas ragengtaoneme esse oe as [ poss as [gs [gp Pf 00 | Dallas Sickiey
|__|snade Sau Repacement Sesgulrae | Aan =|] sass | so] so] tte | seo] ear To
[weve [ace | oom | mmo | vam | mm | | sso Tm EPP te te tt fe | Ross Sanderson
Chanes Street, Cooran pathway improvements = Walker ee
| |stston street Pomona pathway improvements SL $50,000 Ross Sanderson De eR a eee Te eR MR Re ee oe RG ey eke a
[Weyba Creek BosrawcRrensoEEston ee ——SSSCSC~C~C~CS~SCSN | CM| | CCPCCCTCdTC CO i'd [Dallas Bickley Project to be camed over to 14/15
Gibson Road (Eumuncl Noosa Rid to Thomas St} On road cycle and Nige! Walker | cwonat | 100737 $440,000 $440,000 = Ross Sanderson Design completed. Documents issued td council crews for construction. Project to be carried over to 14/15.
pedesti impeo [_nigeiwaner | cmon | voorse | somos | somo | sami | sa | sam
———————— I cl
| [Noosa suncton Mini Bus Shetter- Panels for weather protection oan pom | sm {| see {we {os | wm POPP Pee fs jam Briton
| |Neosa Parace Gikelanes Twanetnue _——SCS~C~SCSCS CNW | mm | TOOT | ssooeO | sso | see [| eae pices Scarecersorn ag
SEALED ROAD NETWORK
[ Prcieaeeen aacimron | cums [one [comme [eens [ene [cee [mes FT TT
| _ [Sealed road pavement surveys and Investig |_SryanOconnor | cmoo2s | oraz | séo.co0 [ s6oo00 [ —sasv3_— |] 15.000 [| $23.379 |
ons [sscc2t OT dT hd] hE UT CUT CT
SPORTS GROUNDS & FACILITIES
Noosa District Sports Complex (Cricket Oval) | ose sanaeren | woos | roores | seaco | ssaco | seas | sero | sanaco [OY PT oe |
STORMWATER DRAINAGE [rescweenon | omer | ore seas [wm [va]
| [oantee Estate -Fiood mitgation planning and design ony =| Danntree Estate - Flood mitigation planning and design only a
pene merrners feeder fer tee tee te ee Adam Briton
James Sruton
|_fere se Creex - open drain civil works Ross Sanderson Cm0028 om 424 $45,874 es P| || oem | pamemon
eee re af oe rr fr pt | oe | ee
CM0023 ors7 a |e
STREETSCAPE & ROAD CORRIDORS
| eee | OEE EE Eee ee eee ee |
TRANSPORT INFRASTRUCTURE MANAGEMENT
[Er Ck road Langa Sree iierseion este pgracee oa ae [ee ee ee ||
— Road / nas Street Imersection improvements PIP psf pee fief reef ee pep || 73% Line marking completed, minor works t0 carry over into 14/15.
Trafic study completed. (No Inemarking changes required). Designs fo be issued shortly. Construction works to be cared
lower to 14/15.
| [Noses cancion -Desbecpamng CEA ———SCSCS~S CR SC |= Psion sisess TT
CARRY OVER PROJECTS
| _ [Noosa Spit interpretive Signage | RossSanderson [|
a
Po __iccussto be adoressed
Significant risks
[| seamasr | terse | sovsece | ts2ecne | soncsen |See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.