INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA   22 JULY 2014




                                                     Page 32 of 49

INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA                                    22 JULY 2014

      Internal work. Some of the following items may be able to be deferred until the building has
      operated for some time to determine their need.

      Inspect electrical wiring and if | Provide meterbox and safety Licensed Electrician and
      necessary, re-wire building for | switch and adequate lights and | possible sponsorship of
      light and power               power points to each room      Lighting Supplier
                                    from floor under carpet
     |Sandandsealtimberfloor |                                  sid Flocorsander
                                    against dust
    [Washwalls                    |                              Voluntary labour
    | Take up verandah floorboards [SSCs VluntaryLabour
      matching profile hardwood     damaged floor joists
      required for DDA compliance   jambs
     Fl
      to cupboard
     Se =
      windows
      Provide kitchen bench, sink                                  Joiner and Licensed Plumber
      and taps and connect to water
      and sewerage
      Ease and adjust all windows                                  Carpenter
      and doors, and provide
      adequate security locks
      and doors                     against lead paint removal

                                    refurbished resorts

      displa                        and restoration process

      External Work. Some of the following items may be able to be deferred until the building is
      operating.
      access ramp    ee
      Install rainwater tank and pump                              Licensed Plumber and
      and connect to downpipes.                                    Electrician and possible
      Connect water to toilet                                      sponsorship of Tank Supplier
      cisterns and hose taps
      Paint front and rear stairs and                              Painter or Voluntary Labour
      rear deck, and touch up areas
      where disturbed
     Poon                         Seam                         |
                                    regarding additional parking
    Sea                         | a
      and rear vegetable garden
     [Installexternalsignage |                                  sd Signwriter
     oe
      water and solar power

                                                                                      Page 32 of 49
Log in to download the original file

2014-07-22 Infrastructure & Services Committee Agenda(PDF, 3MB).pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.