Council archive · source document
08/0169 - Response to Information Request [As Published] · 132008.169
Seaview Terrace Vegetation Management Plan minimum grade and to minimise conflict with existing vegetation. construction. Clearing of vegetation ® The clearing of vegetation and subsequent construction of the path is to be done by hand. Zone D Balance of site which predominantly includes remnant vegetation. No Clearing of vegetation ® Unless vegetation poses a hazard or is an exotic species, trees, shrubs and ground covers are not be cleared or pruned in Zone E. Weed Control = Weeds are to be removed by hand or with a Glyphosate product applied at label rates. Vegetation in this zone is not disturbed except for where it poses a specific hazard or is an exotic species. Removed vegetation is replaced as per the Rehabilitation Plan 3.0 RESPONSIBILITIES The contractor is responsible for all aspects of this VMP. Specialist advice should be sought from the project ecologist where required or where there is a need to vary from this plan. Chenoweth EPLA . 09CHO12_VMP_Vers3_23-3-09.doc Mar ‘09
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0169 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 9.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.