Seaview Terrace Vegetation Management Plan

 

outer clearing limits.

= Where branches external to
the 2m construction buffer
intrude this zone and
conflict with construction
activities they may be
pruned using the 3-cut
method (see Attachment 1)

= Engage the services of a
Fauna/spotter catcher
during clearing

Disposal of vegetation

= Cleared vegetation is not to
be pushed into areas of
retained vegetation.

® Vegetation can be mulched : | :

and stored onsite to be
used in landscaping and
rehabilitation. Stockpiles
are to be loose heaps less
than 1000 cubic meters,
less than 2.5m high with
heaps separated by a
minimum of 10m.

Site stabilisation

= Areas from which
vegetation has been
cleared are to be stabilised
following clearing. This
may include the application
of site generated mulch to a

 

depth of 100mm.
Zone B Define Limits of Vegetation outside of 2m
This zone includes the disturbance construction buffer is not

Beach shade pavilion plus a
maximum 2m construction
buffer.

= The location of a Beach
Shade Pavilion is to be
determined and pegged in
consultation with the project
ecologist prior to detailed
design and subsequent
construction. The aim will
be to locate a site that will
result in limited impact on
existing vegetation.

* Construction materials to
be carried in by foot, or
alternatively craned in.

Clearing of vegetation

™ Vegetation to be cleared by
hand and mulched for use
on site.

damaged.

 

 

Zone C

The proposed Sculpture
garden and environmental
walk should be a maximum
1m width and it's ultimate
location determined on site
by positioning. in areas of

 

Define Limits of

disturbance

* Sculpture garden and
environmental walk location
to be determined and
pegged in consultation with
the project ecologist prior to

 

As much as practical
vegetation is not disturbed by
construction of the sculpture
garden and environmental
walk.

 

 

 

Chenoweth EPLA

09CHO12_VMP_Vers3_23-3-09.doc

+

*

Mar ‘09

Used in these records

About this file

File size
9.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0169 - Response to Information Request [As Published].pdf · 9.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.