08/0169 - Response to Information Request [As Published] · 132008.169
All piers must be designed for lateral stability and their depth will be governed by their ability to achieve the loads nominated on the associated structural plans. 7.1.1 Deep Foundations : For cast in-situ piers founded into the NATURAL MEDIUM DENSE SAND, assuming a safety factor of 2.5 the following bearing capacities can be used as a design guide: The footing masses have not been considered. 450mm Diameter Piers 600mm Diameter Piers Depth * (m) End Side friction Total safe End Side Total safe bearing (kPa) capacity of bearing friction capacity of (kPa) pier (KN) (kPa) (kPa) pier (KN) 3.0 474 8.3 98 497 8.3 172 40 608 10.3 141 631 10.3 236 * Piers excavated in the sandy soils will collapse if the walls are not supported. Grout replacement techniques must be used to achieve the capacities indicated above. Steel screw piers are to be designed by a specialist contractor. 7.2 Earth pressures. Lateral Earth pressures can be estimated from the equation: P=0.5y HK Where ty x 16 KN/m3 H = height m K selected from the table below. Earth pressure coefficients for vertical wall designs and friction angle of 32° degrees are as follows; Angie of backfill (degrees) Ka (active) Ko (at rest) Kp (passive) 0 0.294 0.482 3.25 5 0.310 0.508 10 0.328 0.538 Active earth pressures Ka are generated where the wall allows some movement away from the backfill and the soil gains internal strength in this process. At rest earth pressures Ko are produced where walls allow very little movement (such as well braced walls not capable of allowing movement). Kp is a passive earth pressure coefficient. 7.3 Construction: 7.3.1 Excavations All excavations both temporary and permanent must be adequately retained to prevent the occurrence of land slip. Where a retaining wail is required, an exposed cut batter of 1 to 2 (vertical to horizontal) taken from the base of any foundation can be excavated. These earthworks must incorporate shallow surface spoon drains at the base and along the high side of the cut. Drains must have an efficient outflow down-slope and clear of the construction area and should utilise absorption as a means of disposal to minimise the risk of surface scour. Any exposed face should also be protected against the potential for stormwater erosion. All earthworks must ensure the stability of neighbouring structures is maintained through not undermining foundations that support them. This is achieved through the restriction of any earthworks to above a critical depth fine that radiates downwards at an angle of 1 in 2 (vertical to horizontal) from the base of the foundation/structure to be protected. pee SCG Consulting Engineers 3 SCG Ref: 19064(S}
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0169 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 9.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.