Council archive · source document
08/0169 - Response to Information Request [As Published] · 132008.169
wea
“
Seaview Terrace Vegetation Management Plan
= Cleared vegetation must be disposed of in a way that does not spread weed
propagules and seeds;
=" Maintaining local genetic stock and habitat features;
= Areas disturbed through earthworks will be revegetated as soon as possible to
minimise erosion;
* Sealed surfaces can limit water and nutrient flow to tree roots;
° . = Clearing of vegetation on steep sandy sites can result in increased erosion and
— runoff.
ey 2.2 Objectives ne
ote “In order to manage the issues identified in section 2.1, the following objectives were \
. .
defined: ‘ . f
= To restrict clearing to within the area allowed under the vegetation clearing
permit;
® Carry out clearing in a sequential manner to Prevent damage to surrounding
retained vegetation;
" To minimise disturbance to protected and retained vegetation; '
= To retain, protect and enhance areas of native vegetation and to revegetate and
landscape areas disturbed;
= To maximise the utilization of existing plants and habitat elements within
revegetation areas;
To reduce erosion
‘ 2.3 Strategies
To manage the issues associated with vegetation clearing and to fulfill the objectives of
this plan, the following specific requirements for each zone are outlined in Table 1.
table 1: Specific Requirements
Zone A OT Define Limits of 7 : PAn appropriate visible
This zone includes the main | disturbance temporary fence with
dwelling plus a maximum 2m | ® A maximum disturbance appropriate signage along the
. | construction buffer zone of 2m surrounding the | boundary of the construction we
nie mot Surrounding t the proposed proposed structure has footprint area prior to” moe
we ” . structure - woe been allowed for. vegetation clearing is in place}
os tee Vegetation external to this tn LE
foe net . ty . ‘ aa buffer area should not be Induction of contractors will..”"|} *
. : : woe damaged or disturbed be undertaken to assist them
* : : except where they pose a in complying with the
7 hazard. requirements of this VMP.
Clearing strategy
® Clearing shail be carried out Cleared vegetation has been
in a sequential manner disposed of as per instruction
starting from the point of
entry, extending the centre
of the development footprint
and then moving to the
Chenoweth EPLA . . 09CHO12_VMP_Vers3_23-3-09.doc Mar ‘09
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0169 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 9.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.