Seaview Terrace Vegetation Management Plan

= Cleared vegetation must be disposed of in a way that does not spread weed
propagules and seeds;

=" Maintaining local genetic stock and habitat features;

= Areas disturbed through earthworks will be revegetated as soon as possible to
minimise erosion;

* Sealed surfaces can limit water and nutrient flow to tree roots;

° . = Clearing of vegetation on steep sandy sites can result in increased erosion and

— runoff.
ey 2.2 Objectives ne
ote “In order to manage the issues identified in section 2.1, the following objectives were \
. .

defined: ‘ . f

= To restrict clearing to within the area allowed under the vegetation clearing
permit;

® Carry out clearing in a sequential manner to Prevent damage to surrounding
retained vegetation;

" To minimise disturbance to protected and retained vegetation; '

= To retain, protect and enhance areas of native vegetation and to revegetate and
landscape areas disturbed;

= To maximise the utilization of existing plants and habitat elements within

revegetation areas;

To reduce erosion

 

‘ 2.3 Strategies

To manage the issues associated with vegetation clearing and to fulfill the objectives of
this plan, the following specific requirements for each zone are outlined in Table 1.

table 1: Specific Requirements

   
    

 

   

 

Zone A OT Define Limits of 7 : PAn appropriate visible

This zone includes the main | disturbance temporary fence with
dwelling plus a maximum 2m | ® A maximum disturbance appropriate signage along the
. | construction buffer zone of 2m surrounding the | boundary of the construction we
nie mot Surrounding t the proposed proposed structure has footprint area prior to” moe
we ” . structure - woe been allowed for. vegetation clearing is in place}
os tee Vegetation external to this tn LE
foe net . ty . ‘ aa buffer area should not be Induction of contractors will..”"|} *
. : : woe damaged or disturbed be undertaken to assist them
* : : except where they pose a in complying with the
7 hazard. requirements of this VMP.

Clearing strategy

® Clearing shail be carried out Cleared vegetation has been
in a sequential manner disposed of as per instruction
starting from the point of
entry, extending the centre
of the development footprint
and then moving to the

 

 

 

 

 

 

 

Chenoweth EPLA . . 09CHO12_VMP_Vers3_23-3-09.doc Mar ‘09

Used in these records

About this file

File size
9.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0169 - Response to Information Request [As Published].pdf · 9.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.