SUPERSEDED - Decision Notice - Minor Change - DBW21 0026 01 [As Published] · DBW21/0026.01
17. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
18. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
19. All earthworks must be undertaken generally in accordance with:
a. the recommendations of the report prepared by Tectonic Geotechnical &
Environmental Engineers for the subject site, No. 21236-001-Rev0, dated 16 July
2021, titled “Geotechnical Investigation”; and
b. SCG’s drawing No. 31158-C1.1, dated July 2021, titled “Proposed Earthworks
Control”.
20. All earthworks and retaining structures must:
a. be supervised by a Registered Professional Engineer of Queensland (RPEQ),
and
b. certification of the completed works by a Registered Professional Engineer of
Queensland (RPEQ) must be submitted to Council prior to the commencement of the
use.
21. All earthworks and associated retaining structures/batters, both above and below ground
level and both temporary and permanent, must be contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to Council. All
earthworks must be undertaken in accordance with the provisions of Australian Standard
AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
22. Earthworks carried out on site must not affect the structural integrity of any of the adjoining
lands and/or buildings and/or structures and/or services.
23. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
Damage to Services and Assets
24. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Demolition
Demolition
25. Security to the value of $5,000 must be provided to Council prior to the issue of the
development approval for building works. The security must be in the form of a cash bond or
bank guarantee, for security against satisfactory completion of works.
26. Any damage to footpaths, street plantings, natural vegetation/trees kerb and channel,
bridges or roadways at the removal site, the new site or between the sites must be repaired
or reinstated to at least pre-existing conditions.
27. All waste materials are removed from site.
Page 4 of 7
Document Set ID: 22806498
Version: 3, Version Date: 13/02/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - Decision Notice - Minor Change - DBW21 0026 01 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 179 KB (small file)
- File type
No other editions are linked here.