SUPERSEDED - Decision Notice - Minor Change - DBW21 0026 01 [As Published] · DBW21/0026.01
28. Litter, erosion and sediment control measures are to be installed and/or maintained until soils
are stabilised by vegetation or sealed. NB: it is an offence under the Environmental Protection
Act 1994 to deposit or potentially allow litter, waste, soil, or other contaminants to enter a
waterway or storm water drainage system (e.g. roadside gutter).
29. Removal of building materials containing asbestos must be undertaken by a licensed
asbestos removalist.
30. Asbestos removal work (Section 466) of the Work Health and Safety Regulation
2011 requires a licensed asbestos removalist to give notice to Workplace Health and Safety
Queensland (WHSQ) of licensed asbestos removal work at least five days before the work
commences. Notification must be made using Form 65: Notification of licensed asbestos
removal work, demolition work or emergency demolition.
31. All building materials containing asbestos products are wrapped and disposed of in
accordance with the Public Health Regulation 2006 and the Environmental Protection
Regulation 2008. NB: Asbestos is a Regulated Waste. The Department of Environment &
Science licenses businesses that transport asbestos waste, and landfills that accept this
waste.
32. All building materials containing asbestos, including asbestos cement sheeting or roofing and
lagging are removed from the building prior to demolition/relocation.
33. It is a requirement of the ‘Plumbing and Drainage Regulation 2019’ that at demolition of a
building classed 1-10, the existing sanitary drain upstream from the connection point for a
service provider’s sewerage system must be sealed water tight. This work is deemed as
Notifiable Work and must be carried out by a suitably licenced plumber who shall submit an
As Constructed plan and Form 4 (Notifiable Works Form) to the QBCC (Queensland Building
Construction Commission) within 10 days of completing the work.
5. REFERRAL AGENCIES
Not applicable.
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
Co-ordination of Operational Works Assessment
1. Additional application fees apply to Operational Work applications where the different
aspects of the works are lodged separately. Significant savings in application fees will result
if all works are lodged in a single application.
Infrastructure Charges
2. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
Building and Construction Industry (Portable Long Service Leave) Levy
3. The QLeave levy must be paid prior to the issue of a development permit where it is required.
Council will not be able to issue a Decision Notice without receipt of details that the Levy has
been paid.
Private Infrastructure
4. All private infrastructure for the development must be designed to meet the planning scheme
requirements unless otherwise agreed by the relevant authority
Page 5 of 7
Document Set ID: 22806498
Version: 3, Version Date: 13/02/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - Decision Notice - Minor Change - DBW21 0026 01 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 179 KB (small file)
- File type
No other editions are linked here.