9 1617T012 MUNNA POINT FORESHORE REHABILITATION STAGE 2 - TENDER
ASSESSMENT
DOCUMENT INFORM AT ION
Author Technical Officer – Coastal and Foreshores, David Shing
Planning & Infrastructure Department
Index ECM/ Subject/ Beach Access
ECM/ Projects (T1) / Munna Point Rehabilitation Stage 2
Attachments 1. Tender Evaluation Matrix
EXECUTIVE SUMMARY
The Munna Point foreshore was severely eroded during Cyclone Oswald in January 2013. The
erosion caused large trees to become undermined and a large scarp had developed along the
shoreline. At the time, Council immediately installed a geofabric wall as emergent works to attempt
to stop further erosion. The Development Approval for these emergent works required Council to
look at a permanent solution to address erosion at this site.
The Department of Environment and Heritage Protection, via Council’s consultation process,
recommended that Council should trial a groyne field to address the erosion and channel issues.
It was anticipated that such a solution would ensure that any sand nourishment undertaken on the
Munna Point Caravan site would be better protected.
The design of the groyne field was to be delivered in two (2) stages. Stage 1, was a trial to ascertain
whether the groyne field would successfully address erosion issues and, if so, then the remaining
groynes (Stage 2) were to be constructed.
Stage 1 of the groyne field was completed in August 2015. Monitoring of Stage 1 has been carried
out by Council’s surveyor with the survey results being reviewed by Council’s consultant
International Coastal Management (ICM). The survey results demonstrate that the groynes have
been successful in helping the accretion of sand on the beach. Erosion at the site has been
minimised and dredging operations have allowed the river channel to move away from the Munna
Point foreshore.
RECOMMENDATION
That Council note the report by the Coastal and Foreshores Technical Officer to the Services &
Organisation Committee Meeting dated 8 November 2016 and award contract 1617T012 Munna
Point Foreshore Rehabilitation Stage 2 to Rimlex Pty Ltd t/as Nabis Dredging.
REPORT
1. Tender Process
An open invitation to tender was advertised seeking suitably skilled and experienced contractors
for the construction of coastal works.
2. Tender Assessment
A tender evaluation panel was established to review the submissions received, including an
external technical consultant, International Coastal Management (ICM), panelled as the
engineering expert for coastal works. ICM will also certify the completed work.
Page 51 of 111
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.