Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2016-11-14 General Committee Agenda

of 111

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                            8 NOVEMBER 2016


Five (5) tenders were received, four (4) conforming and one (1) non-conforming. The evaluation
panel carried out an assessment of the four (4) conforming tenders:

    Hall Contracting Pty Ltd
    Marine Civil Contractors
    Neo Infrastructure
    Rimlex t/as Nabis Dredging

Tenders were evaluated using the following criteria:

    Capability and Resourcing;
    Track Record;
    Methodology;
    Quality;
    Safety;
    Environment Sustainability;
    Contribution to Local Economy; and
    Price.

The evaluation methodology considered non-price elements (65% of the score) and a price
component (35% of the score). The tender evaluation matrix is provided at Attachment 2.

3.    Evaluation

Nabis Dredging have demonstrated high expertise in the construction of coastal projects in
Queensland, and is the contractor who constructed the Stage 1 Munna Point Groynes.

Nabis Dredging scored the third highest total technical score, however were the lowest tenderer
on price. Whist Nabis scored the lowest for the Quality and Safety categories, Nabis did
demonstrate to the tender evaluation panel that they had:
    a sound Construction Safety Plan;
    satisfactory Work Safety and Induction Plans in place; and
    appropriate Quality Management Systems in place.

Previous Council Consideration

Nil

Finance & Risk

A provision of $280,000 (excluding GST) has been made within the 2016/17 budget, Nabis Pty
Ltd’s tender is $263,737 (excluding GST).

The risks of not constructing Stage 2 of the groyne field are:
    the risk of loss of revenue to the Munna Point Caravan Park if campsites are not available
      due to erosion.
    the risk of exposed foreshore and geofabric bags causing a public trip hazard and a loss of
      aesthetic appeal to the foreshore.




                                                                                 Page 52 of 111
Log in to download the original file

2016-11-14 General Committee Agenda(PDF, 14MB).pdf · 14.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.