Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2016-11-14 General Committee Agenda

of 111

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA   8 NOVEMBER 2016


                                                    ATTACHMENT 1




                                                      Page 54 of 111

Final Evaluation

                                                             Weighted Attribute Evaluation Spreadsheet

                                          16177012
                                          Hans Point Foreshore Renepinaton See °
                                                                    PRICE
No. |NAME OF TENDERER                                            excl of GS
 1                                                                                         Sama            ore |            =        =       ont      »       vee
 2 |Marine Civil Contractors Pty Ltd                                   $298,871                              :                                                 :
 3  |Entracon Civil Pty Ltd                                                 ee)             The ratings:
 4  |Hall Contracting Pty Ltd                              |       ——«$410,582)             * 0 (zero) = Unacceptable — a fail for that criteria and extreme risk
 5  |Rimlex Pty Ltd t/as Nabis Dredging                                                     + 20 (twenty) = Very Poor — the content of the submission for that criteria is of a low standard and high risk
    Aas                                                                                     * 40 (forty) = Poor — the content of the submission for that criteria is unimpressive and poses a moderate risk
  ja                                                        Po                              * 60 (sixty) = Good — the content of the submission for that criteria is meritable and will need to be monitored if awarded
    a |                                                                                     + 80 (eighty) = Very Good — the content of the submission for that criteria is of a high standard and advantageous
                                                           | Po                             * 100 (one-hundred) = Exceptional — the content of the submission for that criteria is flawless / outstanding and most adva
    Ls
    S| Po                                                                                   Once all the data is entered the resultant scores based on the price and non price elements are automatically calculated fc
    NON-CONFORMING TENDERS
 1  [BoralQuaresSSSCSCSCSC*dD no evaluate                                                              Number of Tenders Evaluated       =    [5]
                                                           |
                                                                            1                   2                    3                   4                   5
                                                                                                                                                 Rimlex Pty Ltd
                     .                                                                Marine Civil     Entracon Civil Pty | Hall Contracting                .
    ~ : ~ _               ™_
                                                                                                                                                    Dredging
    Evaluation Criteria                  wercemna on | srt] “owe |                   asot| “see [Seng] “een                Pong] et [Pong | een
                                                                        Resultant            Resultant           Resultant            Resultant           Resultant
                                                                       weighting            weighting            weighting           weighting            weighting
    capabiity @Resourcing                 | 10%                                            jes | 4 | + Fe                            >                  ey:
    a                                                                                                           ee
                                                *                                          P|                                                           Pa
    Enironment&Surananiy                  |                                                                                                             Pa
      ontributiontoLocal Economy        | 15% | 8 | 12 | @ | 12 |e | iz | wo | s | o | s
    Total Technical Score                       65%         Po      8145 T8985 8
    Normalised Technical Score (Tn)                        Po        AS
                                                             Neointrastructure |oontractors PtyLtd|           Ltd        |      ytd
    PART B - Price element                                    Neo Infrastructure  Contractors Pty Ltd          Ltd                Pty Ltd        Nabis Dredainc
    Total Fees (Pc)                             35%                $349,437            $298,871               $O                $410,582            $263,737
    Average Fees (Pav) $...........2.....22.-.- $264,525
    Price Score                                                      68                   87                    0                  45                  100
    Normalised Price Score (Pn)                                      68                    87                   0                   45                 100
    Weighted Price Score (Pw
    Total Score of price and non price
    elements
    OTHER DETAILS
        Assesment panel member 1               Technial Officer - Coastal and Foreshores, Planning and Infrastructure
        Assesment panel member 2                      Workplace Health and Safety Advisor, Executive Office     The Contract Administrator confirms the above weightings
        Assesment panel member 3                        Environmental Officer, Planning and Infrastructure                           Contract Administrator's signature:
        Assesment panel member 4                                            -

                                                                                                                                                   Page 54 of 111
Log in to download the original file

2016-11-14 General Committee Agenda(PDF, 14MB).pdf · 14.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.