SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 8 NOVEMBER 2016
BRANCH ACTIVITIES RECENT ACHIEVEMENTS CURRENT PRIORITIES THE NEXT QUARTER
Deliver Maintenance Programmes and Preventative maintenance Comprehensive audit of all 66 BBQs Audit of Council owned park shelters
Capital Works programme is on-going with results within the Shire with report to be Provide park shelter audit information
1. Amenities blocks/ lighting, park reducing overall reactive provided to Civil Operations to asset owners
shelters/ BBQs/ water meters/ maintenance cost Develop stage 4 for the reduction of Fire panel replacement Hastings
sporting facilities Replacement/ repair of 16 BBQs in existing water meters. Street Noosa Heads
Gympie Tce Develop programme for the audit of Agreement with Heritage Department
Completed stage 3 of the water meter Council owned park shelters (lighting, for the delivery of work for Cooroy
reduction programme. condition and water supply) Lower Mill Site.
Completed refurbishment of Noosa Delivery of contract works for Cooroy
Heads Beach front public amenities Lower Mill Site.
block
Fire panels installed and capital
works completed. (depot workshop,
main building depot, leisure centre)
Refurbishment of Leisure Centre
reception completed
Electric mains board replacement at
Boreen Point Camp Ground
Undertake targeted actions for high risk Fire system audits and testing Residual Current Devices (RCD) Continue to manage testing
assessment of Council owned assets requirements have been completed programme testing timeframe programmes for Council owned
1. WH&S, fire systems, air-conditioning New Fire Panel installations have delivery buildings
systems, sharps, electrical, backflow been completed.(all Council owned Maintain current levels of service in Deliver maintenance requirements
prevention, security buildings) providing effective and affordable for the safe operation of councils air-
Audit and testing programme for maintenance on Council assets. condition assets.
backflow prevention devices has
been completed
Air-conditioning contract for
maintenance contract has been
awarded with maintenance
programme to be developed.
Continue to develop the Buildings Business Continuity Plan completed Develop and plan for a simulated Implement testing exercise
Business Continuity Plan (Council Main exercise to test the BCP
Corporate Buildings) and develop testing
schedules, and undertake a major
exercise during the financial year
Page 94 of 111
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.