Implementation of the Bushfire Management and Evacuation Plan prepared for the
site by Altum Constructions.
The following Body Corporate / Site Manager responsibilities be included in the
Community Management Statement for the development to further manage bushfire
risk:
a) Induction of staff to ensure awareness of Bushfire and Evacuation
Management Plan requirements;
b) Review the Bushfire and Evacuation Management Plan document
annually at the Body Corporate AGM with any changes to be made as
required;
c) Maintain all common landscape areas including:
Removal of combustible matter including leaves
Any new planting within the common areas must use fire retardant
species in accordance with the approved Vegetation Management
Plan.
Inspect the fire retardant hedge barrier every 3 months and replace
any die-back.
d) Maintain a register of mobile phone numbers of owners and tenants and
provide an automated text message service to alert all residents and
tenants in the event of fire.
e) Conduct tests and inspections of fire alarms in accordance with the
requirements of the Australian Standard 1851-2012 Routine service of
fire protection systems and equipment.
f) Conduct tests and maintenance on fire hydrants in accordance with
AS1851-2012.
8.0 CONCLUSIONS
Duke Environmental was commissioned by Altum Constructions to undertake this Bushfire
Hazard Assessment and Management Plan. The site is located at Resort Drive, Noosa Heads
and is described as Lot 6 SP178340.
The proposal consists of an application for a residential development comprising a total of 42
units with associated roads and infrastructure. The site was observed with topography
analogous with Rolling Hills (>10% to 20%).
Generally, based on the hazard scores we calculate the position of part of the development to
represent a high risk for bushfire attack, due to the site topography in this location and the
neighbouring National Park.
The predominant mature canopy tree height for the mapped hazardous vegetation
surrounding the proposed development is approximately 13m. The proposed building
envelopes allow a minimum 13m buffer to the canopy of this vegetation. The development on
site should include the removal of all hazardous vegetation and surface fuels on the site.
Based on the above assessment it is considered that the proposal be approved subject to the
recommendations in Section 7.0 of this report.
AA1345BFIRE Rev.2
April 2016
JS/js
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.