Skip to the record
For the highest quality transcripts.

Original source · versioned page text

RFI - Attachment C - Civil Engineering Report

of 60

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 12, section 1. The text section number identifies this passage in the reader.

31 May 2019



13         CODES
The following Noosa Shire Council Planning Codes have been addressed as part of this development.
These code responses are attached in Appendix 5.

          Earthworks;
          Roads and Drainage;
          Erosion and Sediment Control; and
          Water Sensitive Design.



14         CONCLUSION
This Civil Engineering Report demonstrates that under the proposed plans the site will be adequately
serviced for water and sewer from the proposed connections to the infrastructure mains and electricity
and telecommunications will be provided to the site with connections undertaken in accordance with
the requirements of the relevant authorities.

Roadworks completed on site and on Hoffman Drive will be undertaken in accordance with the relevant
Noosa Shire Council and Australian Standards.

All earthworks undertaken on site will be compliant with all relevant Australian Standards to minimise
environmental impacts. The earthworks will also ensure compliance with the findings of the Acid Sulfate
Soils investigation.

The proposed shoring will be designed to support the neighbouring properties during both the
construction and operational periods.



15         LIMITATONS OF REPORT
MPN have prepared this report for the proposed Medical centre development at Hofmann Drive
Noosaville in accordance with MPN’s proposal to Ribarja Property. This report is provided for the
exclusive use of Ribarja Property for this specific project and its requirements. It should not be used or
relied upon by a third party and MPN accept no responsibility for the use of this report by any party
other than Ribarja Property.




Excellence with Economy in Engineering                                                                       11
l:\7000-7999\7700-7799\7700\reports\31-05-19 civil engineering report_issue c.docx
Log in to download the original file

RFI - Attachment C - Civil Engineering Report.pdf · 15.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.