RFI - Attachment C - Civil Engineering Report
The original of this document is very large (15.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 43, section 1. The text section number identifies this passage in the reader.
EROSION AND SEDIMENT CONTROL CODE
Performance Criteria and Acceptable Solution
Hofmann Drive Medical Centre
1 August 2018
Issue A
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE
Erosion and drainage control, sediment capture and stormwater runoff
PO1 AO1.1 RO1.1
Development design, density, layout, and staging provide Construction works are designed, planned and executed Complies – The proposed construction works will be
for erosion control, drainage control and sediment capture with respect to the principles of erosion reduction, designed, planned and executed with respect to the
and treatment during the construction phase. drainage management and sediment capture in principles of erosion reduction, drainage management and
accordance with Appendix 2, Table A of the Queensland sediment capture in accordance with Appendix 2, Table A of
State Planning Policy and the Queensland State Planning Policy and International
Erosion Control Association Best Practice Erosion and
International Erosion Control Association Best Practice Sediment Control (BPESC) 2008.
Erosion and Sediment Control (BPESC) 2008;
AND
AO1.2 RO1.2
Construction works are designed and managed to restrict Complies – The proposed construction works will be
the extent of clearing and soil exposure to that necessary designed and managed to restrict the extent of clearing and
for access, and safe construction; soil exposure to that necessary for access, and safe
construction.
AND
AO1.3 RO1.3
Clean stormwater is diverted or managed around or Complies – Where applicable, clean stormwater will be
through the site without increasing the concentration of diverted around the site without increasing the concentration
total suspended solids or other contaminants in the flow of total suspended solids or other contaminants in the flow
and without causing erosion (onsite or offsite); and without causing erosion (onsite or offsite).
AND
l:\7000-7999\7700-7799\7700\codes\01-08-18 erosion and sediment control code.docx
Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.