RFI - Attachment C - Civil Engineering Report
The original of this document is very large (15.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 44, section 1. The text section number identifies this passage in the reader.
EROSION AND SEDIMENT CONTROL CODE
Performance Criteria and Acceptable Solution
Hofmann Drive Medical Centre
1 August 2018
Issue A
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE
AO1.4 RO1.4
Cleared areas are effectively stabilised prior to rainfall if Complies – Cleared areas will be effectively stabilised prior
works are delayed or works are not intended to occur to rainfall if works are delayed or works are not intended to
immediately; occur immediately.
AND
AO1.5 RO1.5
For buildings, Complies – Where applicable,
a) upstream runoff must be diverted around the a) Upstream runoff will be diverted around the construction
construction site; and site;
b) sediment barriers are provided downslope of disturbed b) sediment barriers will be provided downslope of disturbed
areas to prevent sediment washing into gutters, drains areas to prevent sediment washing into gutters, drains and
and watercourses either on or off the site; and watercourses either on or off the site;
c) exposed soil and construction access must be c) exposed soil and construction access will be managed in
managed in accordance with International Erosion Control accordance with International Erosion Control Association
Association Best Practice Erosion and Sediment Control Best Practice Erosion and Sediment Control (BPESC) 2008;
(BPESC) 2008; and
d) temporary or permanent downpipes will be connected to
d) temporary or permanent downpipes are connected to the stormwater system before laying the roof; or
the stormwater system before laying the roof; or
e) localised erosion will be avoided by directing flow from
e) localised erosion is avoided by directing flow from downpipes over non-erosive areas.
downpipes over non-erosive areas.
l:\7000-7999\7700-7799\7700\codes\01-08-18 erosion and sediment control code.docx
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.