RFI - Attachment C - Civil Engineering Report
The original of this document is very large (15.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 49, section 1. The text section number identifies this passage in the reader.
ROADS AND DRAINAGE CODE
Performance Criteria and Acceptable Solution
Hofmann Drive Medical Centre
1 August 2018
Issue A
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE
AO3.3 RO3.3
c) minimise changes to the hydrological regime, including Road infrastructure within or adjacent to native habitat No new public roads are proposed to be constructed as part
drainage patterns, run-off and water quality; incorporates fences which allow for protected wildlife of the development.
movement and controls unrestricted access of domestic
d) avoid crossing watercourses, drainage lines and cats and dogs;
wetlands, but where such crossings are unavoidable,
disturbed areas are reinstated and revegetated on AND
completion of works; and
AO3.4 RO3.4
e) minimise bulk earthworks. Native vegetation is protected from clearing or Complies – Where applicable, native vegetation will be
construction activities by— protected from clearing or construction activities, as a
minimum, by-
a) clearly marking vegetation to be retained with flagging
tape; a) clearly marking vegetation to be retained with flagging
tape;
b) installing protective fencing around the dripline of
vegetation; and b) installing protective fencing around the dripline of
vegetation; and
c) ensuring stock piling, storage and vehicle parking occur
outside the areas of vegetation to be retained; c) ensuring stock piling, storage and vehicle parking occur
outside the areas of vegetation to be retained;
AND
AO3.5 RO3.5
Low impact construction techniques are used around Complies – Where applicable, low impact construction
areas of vegetation to be retained to minimise interference techniques will be used around areas of vegetation to be
with the vegetation. retained to minimise interference with the vegetation.
l:\7000-7999\7700-7799\7700\codes\01-08-18 roads and drainage code.docx
Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.