RFI - Attachment C - Civil Engineering Report

of 60

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 48, section 1. The text section number identifies this passage in the reader.

ROADS AND DRAINAGE CODE
Performance Criteria and Acceptable Solution
Hofmann Drive Medical Centre
1 August 2018
Issue A

             PERFORMANCE OUTCOMES                                               ACCEPTABLE OUTCOMES                                                    RESPONSE

PO2                                                               AO2.1                                                         RO2.1
Stormwater drainage infrastructure is planned, designed           Stormwater drainage planning, design and construction is      Complies – All proposed stormwater drainage will be
and constructed to—                                               in accordance with Section 4 of PSP5 Engineering Design       designed and constructed in accordance with Section 4 of
                                                                  Standards – Roads, Drainage and Earthworks;                   PSP5 Engineering Design Standards – Roads, Drainage
a) be accessible, cost effective and easily maintainable;                                                                       and Earthworks.
                                                                  AND
b) protect downstream capacity;.
                                                                  AO2.2                                                         RO2.2
                                                                  As Constructed data is submitted in accordance with           Complies – Where applicable, as constructed date will be
c) protect downstream water quality;
                                                                  Section 6 of PSP5 Engineering Design Standards –              submitted in accordance with Section 6 of PSP5
d) maximise on-site stormwater retention and retardation;         Roads, Drainage and Earthworks;                               Engineering Design Standards – Roads, Drainage and
and                                                                                                                             Earthworks.

e) convey run-off to stormwater drainage in a manner that         AO2.3                                                         RO2.3

allows roads to be trafficable in Q100 ARI local rainfall         Stormwater drainage planning, design and construction is      Complies – The stormwater drainage planning, design and

events.                                                           in accordance with the Queensland Urban Drainage              construction will be undertaken in accordance with the
                                                                  Manual.                                                       Queensland Urban Drainage Manual.

Environmental Protection.
PO3                                                               AO3.1                                                         RO3.1
Roads and stormwater drainage infrastructure are located          Roads and stormwater drainage follow the edge of              Not applicable – All frontage roads and stormwater
and aligned so as to—                                             existing disturbed areas, or alternatively, these works are   connections to the site are already constructed.
                                                                  co-located within a combined utility corridor;
a) minimise disturbance to native vegetation and/or other
habitat areas;                                                    AND
                                                                  AO3.2                                                         RO3.2
b) protect and maintain wildlife corridor movements and the
                                                                  Roads avoid native vegetation and provide for fauna           Not applicable – No new public roads are proposed to be
safety of native fauna;
                                                                  underpasses and associated fencing where appropriate;         constructed as part of the development.

                                                                  AND


l:\7000-7999\7700-7799\7700\codes\01-08-18 roads and drainage code.docx
                                                                                            Page 3
Log in to download the original file

RFI - Attachment C - Civil Engineering Report.pdf · 15.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗