Council archive · source document
Superseded Tpc 647 · 51901.4288.01
P,C.Rodger PCR, jh 18th Naxch, TT Ltd. , Res T,P,C, SAT your application for the erection of o cabain seven (7) units, and to a my be loca jitmated at allotments 28 and 29 of seoblo wade, Noosa Sound, at its meeting of the 16th 4. larch, 1977. Gommeil resolved that your application be approved subject to the following conditions:- Tt. ae Compliance with all relevant by~laws and policies. ‘ a disturbance to natural flora. No vegetation to be removed other than that which would impede + operations, Where practicable re-vegetation to be carried ovt following cessation ef building activity. mb covered car parking to be provided on the (7) vehicles, together with space " x two (2) visitors! vehicles. Areas on which vehicles will be driven and/or parked to be provided with a flexible or other pavement surfaced with bitumen seal coat, asphaltic or other concrete properly constructed and maintained to good engineering standards to the satisfaction of the Comeil's Engineer. Plans and specifications for such areas including footpath crossings to be submitted pkior to issue of a pbuilding permit. Vehicular access to and from the site to be designed so as to ensure that sufficient area is available for maneeuvring and turning to permit forvard movement to and from the road. A conerete invert and paved access to connect to the existing bitumen voad pavement to be constructed to the satisfaction of the Comeil's Engineer. Only one entry point to the road will be pemmitted and additional recreation space and the repositioning of one visitor's car is to be shown on the plan submitted with the building application and as a result of the elimination of one of the entry points as shown. Connection to Comcil's sewerage system at the applicant's expense. . Conmneetion to Council's nati aanbies aware 4. ee water supply facility atthe
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 1 page
Page 2
Baroy Industries Pty. Td. Sth March, 1977 g Be 10, 14. 12. 13. 14. (2) Stormwater, including that irom roofed and paved areas tp be Gisposed of by underground means to Council's existing kerb and channel im the adjacent road. No earthworks ox filling are to be carried out on the site wtbil the requirements of the. Council's engineer heve been obtained in writing. Such requirements to be obtad oplor to the issue of a building permit. Comply with the reasonable requirements of the Regional Fire Safety Officer. ‘ fhe approval given herein is for Town Plan Congent only and does nob imply either the issue of a building permit ar Coueil consent to an application under the Gruup Ditles Act or Building Unit Titles Act. This approval will lapse if not availed of within two (2) years in accordance with clause 3 (2) of Part IT of Goumeil by-laws Chapter XLIV ~ Tow Planning. A certificate of alignment to be submitted with the application for a building permit andfor an identification survey to be carried out by an authorised surveyor at the time of the foundation inspection. No ensure compliance with any and all conditions of this approval, Council will require that you enter into @ Bank Bond to guarantee performance. The value of such bond would be determined prior to issue of building permit and any costs incidental thereto Will be the applicant's responsibility.
Used in these records
SUPERSEDED TPC 647Related documentApplication case desk ↗
About this file
- File size
- 196 KB (small file)
- File type
No other editions are linked here.