Council archive · source document
Superseded Tpc 647 · 51901.4288.01
Baroy Industries Pty. Td. Sth March, 1977 g Be 10, 14. 12. 13. 14. (2) Stormwater, including that irom roofed and paved areas tp be Gisposed of by underground means to Council's existing kerb and channel im the adjacent road. No earthworks ox filling are to be carried out on the site wtbil the requirements of the. Council's engineer heve been obtained in writing. Such requirements to be obtad oplor to the issue of a building permit. Comply with the reasonable requirements of the Regional Fire Safety Officer. ‘ fhe approval given herein is for Town Plan Congent only and does nob imply either the issue of a building permit ar Coueil consent to an application under the Gruup Ditles Act or Building Unit Titles Act. This approval will lapse if not availed of within two (2) years in accordance with clause 3 (2) of Part IT of Goumeil by-laws Chapter XLIV ~ Tow Planning. A certificate of alignment to be submitted with the application for a building permit andfor an identification survey to be carried out by an authorised surveyor at the time of the foundation inspection. No ensure compliance with any and all conditions of this approval, Council will require that you enter into @ Bank Bond to guarantee performance. The value of such bond would be determined prior to issue of building permit and any costs incidental thereto Will be the applicant's responsibility.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED TPC 647Related documentApplication case desk ↗
About this file
- File size
- 196 KB (small file)
- File type
No other editions are linked here.