Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Development Assessment Report

Attached to the e-mail Education Type 2 School - Car Park - MCU18/0097.

of 35

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

   d) Development provides appropriate buffering between noise sensitive uses and the major road
      network and rail corridors;
   e) Roads are designed and constructed to be compatible with the existing road network and
      hierarchy and to provide a safe environment for vehicular traffic, pedestrians and cyclists;
   f) Intersections and access points are designed and constructed to retain the low key
      development style and slower pace enjoyed by residents and visitors;
   g) Road and drainage infrastructure is constructed to a standard that minimizes ongoing
      maintenance costs;
   h) Drainage systems are designed and constructed with capacity to effectively manage or convey
      the design flow;
   i) Road and drainage infrastructure is compatible with other infrastructure; and
   j) Road and drainage infrastructure does not create any adverse impacts upon environmental
      values associated with biodiversity, hydrological cycles, biophysical resources and air quality.

Comment: No roadworks are required or proposed with the development. Appropriate stormwater
drainage will be achieved in accordance with the accompanying stormwater management plan
prepared by Odyssey Consulting Group.


WASTE MANAGEMENT CODE

The overall outcomes sought for the Waste Management Code are the following:

   a) The storage, disposal and management of solid and liquid waste are conducted in an safe and
      ecologically sustainable manner and without environmental nuisance;
   b) The on-site storage of waste does not create environmental nuisance or visual impact to
      adjoining property during the construction of a development; and
   c) Council and other licensed trade waste services are able to conveniently collect and dispose of
      waste generated by the development.

Comment: The proposal is for a carpark only, to provide additional carparking for Good Shephard
Lutheran College. No onsite waste storage or collection is required or proposed with the carpark.


WATER SENSITIVE DESIGN CODE

The overall outcomes sought by the Water Sensitive Design Code are to ensure that:

   a) development is designed, constructed and operated in a manner that contributes to, and
      does not impede, long term attainment of relevant Environmental Values and Water Quality
      Objectives as specified in the Environmental Protection Policy 2009;
   b) development avoids adverse impacts on downstream ecosystems, properties and
      infrastructure due to changes to stormwater flow, water quality or ecosystem health;
   c) stormwater conveyance channels use natural channel design principles to convey external
      catchment stormwater through development and support landscape, passive recreation and
      ecological values;
   d) urban development captures and utilises run-off from appropriate areas for use on site; and
   e) water reuse facilities have no adverse impact on the quality of the town mains water.

Comment: Please refer to the attached Stormwater Management Plan prepared by Odyssey
Consulting Group which demonstrates that appropriate management of stormwater quality and
quantity will be achieved by the development.
Log in to download the original file

Development Assessment Report.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.