Original source · versioned page text
AA1384_Effluent Report_final
Attached to the e-mail Request for Negotiated Decision Notice REC16/0015.
8
Therefore, assuming 150L/person/day the outflow is calculated as:
150L/person/day x 5 persons = 750 L/day
In accordance with AS/NZS 1547:2012, the Design Loading Rate (DLR) of a
trench and bed system, based on sand (Category 1 soil), primary treated
effluent and a conservative rate, is approximately 20mm/day.
Therefore, required trench/bed areas for primary treatment = 37.5m2
The conservative rate of 20mm/day has been adopted for the primary
effluent calculations in accordance with Section L4.1 of AS/NZS 1547/2012
and due to the low nutrient retention capacity of sand.
However due to the sensitive nature of the surrounding environment (coastal
protection area) we recommend advanced secondary treatment, with trench
systems designed in accordance with the requirements of AS/NZS
1547:2012 to reduce the potential for nutrient runoff. The recommended
Design Loading Rate for Category 1 soil with secondary treatment is
50mm/d.
This would reduce the required trench bed areas to 15m2.
4.0 WASTEWATER TREATMENT AND DISPOSAL AREAS
The information below details the requirements for the siting of on-site wastewater treatment
in accordance with AS/NZS 1547:2012 and the Queensland Plumbing and Wastewater
Code 2013 (QPWC).
4.1 Vertical & Horizontal Separation Distances
The on-site sewerage facility shall incorporate measures to ensure that the effects of
the onsite wastewater systems are contained within the property boundaries
including, if necessary, the use of set-backs (AS/NZS 1547:2012 Clause 2.4.1(k)).
Table 4.1
Recommended horizontal separation distances for subsurface land
application areas in accordance with the QPWC
Feature Recommended Horizontal Separation
Distance (metres)
Up slope Down slope Level
Property boundaries, pedestrian paths and walkways, 2 4 2
recreation areas, footings of buildings and retaining
walls footings.
In ground swimming pool 6 6 6
In ground potable water tank 6* 6* 6*
* Note: For Primary effluent and in accordance with the Noosa Shire Council Planning Scheme Policy 24, distance
from an in-ground potable water tank must be 15 metres.
Swimming pools and in ground potable water tanks were not observed on site.
AA1384EFF
September 2016
JS/js
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.